CIPDB › China Industry › Industrial Equipment & Components › Other Equipment & Components
Waste Gas Treatment Desulfurization Acid Mist Purification Scrubber1
Other Equipment ComponentsPurifying ColumnPP Acid Mist Tower
Langfang Yunshi Environmental Protechnology Co., Ltd.
Preview:
Product Description PP spray tower operation procedureFirst. Preparation before starting the machine1. Add the water level of the tank and distribution tank to the equipment overflow port and open the inlet valve.2. Check pump and fan, tighten each bolt in time.Second, the bootTurn on the spray pump switch, and turn on the fan switch after the spray runs uniformly. Observe whether the pump and fan are running normally, whether there is leakage, whether there is abnormal sound.Third, stopCut off the fan power, then cut off the spray pump power, clean the site.Fourthly. Daily maintenance1. When the water level of the distribution tank falls to 200mm above the water inlet of the pump, the distribution tank must be filled with water immediately to prevent the pump from burning out and the temperature in the tower is too high.2. The mixed liquid in the tank should be replaced every 7 days and the sludge should be discharged once a month to prevent the sludge from blocking the water inlet hole of the pump.3. Fill in the equipment operation record for each shift.TANKS SPECIFICATION LISTTank MaterialPP: 12/15/20/25mm thickness based on tank size calculationStainless steel 304/316TANK Reinforcement:Tank with a flat tube [80 × 60 × 4t] reinforcing the circular horizontal 2line, square tube A3 are blasted and rust primer, outerseal 3mmtPP board.* The flat tube size is calculated based on tank sizeWater inlet system(optional)Inlet:1″PVC branch pipe,assemble with doule union PVC ball valveWater drainage system(optional)PP ball valve with flange fitting or customizedAir agitating piping(optional)Bath inner part: configuration: 3/4 "PPR arrangement H-shaped pipeline;Bath outer part: configuration: 3/4 " double union PVC valveHeating system(optional)Stainless steel/Titanium/Telflon materialCooling system(optional)φ19/φ25/φ32 Stainless steel /Titanium material FAQ1. Q: Are you a manufacturer?A: We are manufacturer. We have been engaged in this field for 18 years.2. Q: How many years since you have been in this field?A: We have been engaged in this field for 18 years.We have rich experience for manufacturing and designing the machines.3. Q: How about your product quality?A: We have own research and development team, rich experiences technicians, and professional workers. We pay attention to every detail in manufacturing to ensure Product with high quality.4.Q: What is your MOQ?MOQ is different according to different kinds of product. But we accept small quantity for trial order. Please contact us for details.5. Q: What is payment term?A: T/T 30% deposit and 70% balance before shipment or see the against copy of B/L.6. Q: How can I contact you?A: Please look at my contact card. You can talk to me anytime. Or send me enquiry email, I will reply you in 24 hours andoffer the optimum solution to you.7.Q: How can I get the sample?If sample without logo,we can offer you free sample, but we need to charge you freight. If sample with logo, please contact with us, we will quote you sample and freight.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...