CIPDB › China Industry › Manufacturing & Processing Machinery › Building Material Making Machinery
YX32-333-1000 Rolling Forming Machine for Roof Panel with Ce1
Building Material Making MachineryBoard Making MachineRoll Forming MachineCold Roll Forming Machine
XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.
Preview:
Product Description This Profile Drawing As Below Picture:General Parameter1ItemParameters2Model NO.YX32-333-10003Materialgalvanized sheet4Thickness0.4-0.7 mm5Yield Strength450 MPa6Feed Width1145 mm7Effective width1000 mm8Roll Stages20 Stages9Shafts Diameter?75/95 mm10Main Motor Power7.5 KW11Hydraulic Group Power4 KW12Max. Line speed of roll formerApprox. 15 m/min13Electric StandardAccording to local voltage Machine ComponentsA. 5 Ton X 1250 Hydraulic Un-coiler Hydraulic system expand coil inner hole, Pump motor: 3KWFrequency Inverter to regulate turning speed, Motor: 3KWLink-connect expanding systemLoad capacity = Max.5TonsCoil Inner-diameter= 510±30 mm mm, Coil width = Max.1250mmAutomatic stopping device with limited switch as assistance to control stop/star rotationB. Entry roller & Manual Pre-shearing device Un-powered Smart cut control, to cut off the end of the final piece of sheet onlyWorking thickness up to 0.8mmC. Cold Rolling MillsFeeding section with guide;Gear/Sprocket driving;20-step to form;Rollers manufactured from 45# steel, CNC lathes, hard Chrome CoatedShafts Diameter=ф75/95mm, Precision MachinedMain motor =7.5 KW, Frequency speed controlMax. liner Forming speed:Approx. 15m/min;Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go InsideD. Hydraulic Cutting DeviceStop to cut, Post cut, No Blanking cutHydraulic unit, Pump motor =4KWCutting tool material : Cr12MOV, Heat treatment;E. Electric accessories, IncludingCounting wheel and encoderLimit switches (upper/lower), photoelectric switch for cutting deviceWiring arrangementCut-to-length tolerance due to the control system supplied by user (Liming standard is ≤±2 mm) F. Product Rack Un-powered, 3 units After-Sale ServiceIn correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation:If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians. Terms Of Trade1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...