CIPDB › China Industry › Manufacturing & Processing Machinery › Building Material Making Machinery
Colored Cold Steel Glazed Roof Tile Making Machine /Glazed Roof Tile Machine/Step Tile Roofing Sheet Roll Forming Machine with ISO900/Ce1
Building Material Making MachineryBoard Making MachineTile MachineRolling Machine
XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.
Preview:
Product Description The raw material 0.6mm sheet for inspection, in common use Material: 0.4mm Minimum Thickness, 0.8mm Maximum Thickness Pre-paint Coil; Yield Strength: 250MpaParameters1ITEMPARAMETER2MaterialPPGI3Thickness0.4-0.8 mm4Feeding width600 mm5Yield strength250 MPa6Max. Line Speed Of Roll FormerApprox. 12 m/min7Roll Stages14 Stages8PowerDriven by Servo motor, pump motor: 5.5 KW9Hydraulic Group Power3 KW10Weight:Approx11T11Pressing powerpump motor for hydraulic station7.5 KW(Located inside)12Total power16kw(7.5KW+5.5KW+3KW)Machine Components a.3TONX600mm Hydraulic Un-Coiler Un-powered; Load capacity= MAX.3Ton Coil inner-diameter=500mm oil Width= MAX.600mm Hydraulic system for expansion coil-inner-hole with 4 palms; Link-connect expanding system Pump power=1.5KW;b.Cold Rolling Mills Feeding section with guide;Gear/Sprocket driving;Rollers manufactured from 45# steel, CNC lathes, hard Chrome CoatedShafts Diameter=75mm, Precision MachinedMain motor , Frequency speed controlProtection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Insidec.Hydraulic Pressing/Cutting DeviceHydraulic Cutting Device one setCutting tool material : Cr12, Heat treatment;Hydraulic Group,Pump motor =3KWd.PLC Control SystemFully automatic production: QUANTITY/ PRODUCT LENGTH/PUNCHING POSITION/ (UPTO 100 ORDER MEMORIES).PLC(Siemens), Touch Screen (Siemens), Encoder (Omron), etc.Cut-to-length-tolerance≤±2mmControl voltage 24V Product Rack Un-powered, 3 units After-Sale Service In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation:If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians. Terms Of TradePackage & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required beforethe machine be send out of factory.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...