CIPDB › China Industry › Manufacturing & Processing Machinery › Building Material Making Machinery
YX32-344.3-1033 Roof Forming Machine for Roofing1
Building Material Making MachineryBoard Making MachineTile MachineRoll Forming Machine
XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.
Preview:
Product Description This Producing Process Sketch As Below Picture:This Profile Drawing As Below Picture: General Parameter1ItemParameters2Model NO.YX32-344.3-10333MaterialPre-painted galvanized sheet4Thickness0.4-0.8 mm5Yield Strength550 MPa6Feed Width1200 mm7Effective width1033 mm8Roll Stages20 Stages9Shafts Diameterф75/ 95 mm10Main Motor Power11 KW11Hydraulic Group Power5.5 KW12Max. Line Speed Of Roll FormerApprox.20 m/min13Electric StandardAccording to local voltage Machine Components A. 5Ton*1250mm Un-coil RackNo power; coil inner-diameter=508mm;Load capacity= MAX.5.0Ton, Coiler Width= 1250mmB. Entry roller & Manual Pre-shearing device Un-powered Smart cut control, to cut off the end of the final piece of sheet onlyWorking thickness up to 0.8mm C. Cold Rolling Mills Feeding section with guide; Gear/Sprocket driving;20 stages to form Wall-plate-frame Design Rollers manufactured from 45#,CNC lathes,hard chrome coating Shafts Diameter=ф75/95mm, Precision Machined Main motor =11KW,Frequency speed control Max line speed of roll former: Approx.20m/min Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go InsideD. Hydraulic Cutting Device Stop to cut, Post cut, No Blanking cut Cutting tool material : Cr12, Heat treatment; Hydraulic tank,Pump motor =5.5KW E. PLC Control System Control the quantity & cutting length automatically; Combined with: PLC, Touch Screen, Inverter (SIEMENS), Encoder (Omron), REMOTE CONTROL etc Cut-to-length tolerance≤±2 mm Control Voltage 24VF. Product Rack Un-powered, 3 units After-Sale ServiceIn correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation:If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians. Terms Of Trade1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...