IPDB › China Industry › Manufacturing & Processing Machinery › Assembly Line & Production Line
Trimmer, Planisher, End Cutting Machine for Wheel Rim Manufacturing1
Assembly Line Production Line, Auto and Motorcycle Production Line, Planisher, End Cutting Machine for Wheel Rim Manufacturing, Wheel Rim Manufacturing, Trimmer Planisher End Cutting Machine
Shandong Xiaoya Precise Machinery Co., Ltd.
Preview:
Product Description Product DescriptionTrimmer-Planisher-End cutting Unit of Steel whee rim manufacturing lineFunctions of Each Unit1. The trimmer, also known as the trimming machine, is used to remove weld slag on internal and external surfaces of the weld joint, in order to flatten it.2. The weld planisher will planish, and reinforce the weld joint after the weld slag on it has been removed.3. The end cutting machine is used to cut off leftover material at both ends of the weld joint.Process Pictures for ReferenceMain Parameters of Trimmer, Planisher, End Cutting MachineNo.ItemData1Main machine specificationTrimmerBZJ-500BBZJ-600BBZJ-800BPlanisherGYJ-500GGYJ-600GGYJ-800GEnd cutting machineDQJ-500GDQJ-600GDQJ-800G2Power supplyAC 380V/ 3phase/50HzAC 380V/ 3phase/50HzAC 380V/ 3phase/50Hz3Rated input power37KVA45KVA55KVA4Max. clamping force for trimming6Tons9Tons12Tons5Max. trimming force6Tons9Tons12Tons6Max. clamping force for planishing6Tons9Tons12Tons7Max. planishing force6Tons9Tons12Tons8Max. cutting force28Tons40Tons53Tons9Diameter of cutting oil cylinder125mm200mm220mm10Pressure of hydraulic system12Mpa12MPa14Mpa11Maximum thickness of rim band5mm8mm13mm12Width range of rim band220mm ~350mm300mm ~500mm450mm ~800mm13Diameter range of rim280mm ~450mm400mm ~650mm600mm ~1000mmTRADE TERMSDelivery TimeThe delivery time will be around 1-4 months from the date of receipted down payment.Loading sea port: Qingdao, ChinaPayment TermsThe payment terms will be T/T based on FOB Qingdao, China trade terms, of whichThe first T/T 70% after signing of agreement by both side The second T/T 20% befor delivery from saler's factoryThe balance payment T/T 10% within 10days after installation at buyer's factory which shall not more than 6months from delivery date.Factory TestingThe Buyer can send engineers to Manufacturer's factory for testing those machines before delivery if it is necessary, and the cost of Buyer's engineers including flight, train, hotel and meals shall be at Buyer's own cost. WarrantyThe manufacturer shall guarantee the machines are brand new and correspond in all respects with the quality, specifications and performance as stipulated in this agreement, and also guarantee that the machines when correctly mounted and properly operated and maintained, will give satisfactory performance for a period of 15 months since the date of arrived in Buyer's port.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.