IPDB › China Industry › Manufacturing & Processing Machinery › Assembly Line & Production Line
Fully Automated Lithium Battery Making Machine and Assembly Equipment Packing Production Line1
Assembly Line Production Line, Electronic Production Line, Conveyor, Production Line
Rising Sun East Intelligent Equipment (Guangdong) Co., LTD
Preview:
Product Description Basic Info.After-sales ServiceLifetime After-SalesApplication FieldNew Energy IndustryRepeatability Accuracy0.01mmCooling MethodWater CoolingLaser Wavelength1080nmPosition Accuracy±0.02mmWeight4000 KgDimension(L*W*H)35m*9m*3mMachinery Capacity10ppmMax Speed500mm/STransmission TypeFlexibleAutomatic Production LineComprehensiveCertificationISO, CEFlexible ProductionIntelligent ManufacturingRhythmFlow Production LineWarranty1 YearsTransport PackageInternational Shipping PackagingTrademarkXRDOriginShenzhen,GuangdongProduction Capacity1 Set/Sets Per MonthProduct Description1. Automated Battery Cell Assembling Design Requirements 1.1,Automated Battery Cell Assembling Technical parameter:(1)Equipment capacity: ≥10PPM;(2)The final excellent rate is ≥99.8% (only the bad products caused by the equipment);(3)Equipment failure rate ≤ 2%;(4)Compatible with a variety of size module specifications, quick change. Laser output power stability (fluctuation) ≤±1%, the focal length of the galvanometer can be digitally displayed and adjusted, the range is -5.0~+5.0mm, and the adjustment accuracy is ≤0.5mm;(5)The welding track is edited by welding software, the welding process is automated, the parameters can be modified, and the operation and modification authority can be set1.2,Flow Chart: Tentative process flow, subject to actual requirements 2. Program Layout 2.1 Program Renderings:2.2 Layout Size:Back layout size(L*W*H):19500mm*9000mm*3200mmFront layout size(L*W*H):13000mm*6000mm*2300mm3. Function Module Introduction 3.1 Ceaning Gluing Station 3.1.1 Equipment description:Internal structure diagram of cell cleaning and gluingIntroduction of cleaning and gluing station: 1. After the worker places the battery cell on the feeding conveyor belt, the equipment can automatically complete the cleaning and gluing; 2. Equipment beat: 12PPM; 3.1.2 Equipment parameters: Name ParametersPower supplyAC220V/50HZAir supply0.5-0.7MpaSizeL2600mm*W1250mm*H1800mmWorking temperature5-40oCcleaning rangeX/Y(mm):300/300mmgluing rangeX/Y(mm):300/300mmMoving speedX/Y/Z(mm/set):300mmrepeat accuracy±0.02mmWeightAbout 650KGglue ratio1:1AB mixDynamic mixinggluing accuracy0.02g,The error ratio does not exceed ±5%Robot systemBORUNTE 4 axis RobotOperating modepoint-to-point/continuous line segmentGluing systemHYControl systemHYPneumatic ComponentsAirtac servo motorPanasonic Servo SystemPhotoelectric SensorsOmronPowerMEAN WELL,HENGFUBall screwTBILinear GuidesHIWINFrameFangtong welding mechanism,countertop soldering iron block,gantry millingsheet metalSheet metal fully enclosed structure, transparent windowContact us for more information of automatic assembly line.3.2 Stacking Rotary Tables 3.2.1 Description of the Action Flow:1. Action process: The stacking robot unloads and unloads materials from the gluing equipment conveyor line, and performs stacking operations in the serial-parallel sequence of the module recipes. This stacking method can flexibly accommodate module combinations with different recipes in series-parallel sequences. The stacking sequence is from bottom to top, and the cells and insulating plates are alternated, from the 1st hand cell to the 1st hand insulating plate, and then to the last hand 1 cell. During the stacking process, a downward pressing and beating mechanism is simultaneously pre-pressed and fixed. 2. The gripper is controlled by the robot to control the gripping mechanism, and the gripper is designed with photoelectric induction cells in place. The module stacking platform adopts a fixed-slope dual-station design. Each station contains dual clamps, which can place two cells at the same time. When the A station is stacking, the B station synchronously performs the moving work before extrusion, and the double station alternates, so as to improve the efficiency of stacking and moving.3.2.2 Changeover Strategy Explained:1. Change the cell gripper: choose a long-stroke clamping cylinder, which can be automatically compatible with different types of cells when changing;2. Changing the gripper of the insulating plate: the vacuum suction cup assembly is installed on the aluminum profile, and the distance between the suction cups can be adjusted manually according to the width of the insulating plate when changing the model.3. Electrical program: According to the serial-parallel stacking sequence of compatible modules, the robot performs the stacking operation according to the preset robot stacking sequence program. Before changing the model, the stacking program of the model-changing product is transferred. 3.2.3 Changeover Strategy Explained:3.3 Function module introduction 3.3.1 Extrusion station: Double-row module process1. The handling robot transports the single-row stacks 1 and 2 respectively from the stacking turntable to the extrusion table sliding table, and the sliding table slides to the manual extrusion position; 2. Manually install the middle partition board (manual cleaning and gluing), end insulation board (manual cleaning and gluing), and end plates (manual cleaning and gluing), and then press the button to install the steel cable ties. 3.3.2 Extrusion station:3.3.3 Extrusion station: Equipment flow description: 1. Place the glued cells by the handling robot to the discharge position of the sliding table, and the sliding table automatically slides to the manual extrusion position;2. Manually attach both ends to the end plate, install the side rails, first press the width direction extrusion button to make the length direction of the module horizontal; then press the extrusion start button, the cylinder drives the top plate to extrude the cell, When it reaches the set length, it stops, inserts the steel belt, punches the plastic steel belt, and rives the screw;3. After the installation is completed, press the open button, squeeze the cylinder to retract, and then press the slide button, the installed module slides to the discharge position again, and the robot grabs it to the stationary trolley.3.3.4 Extrusion station: Changeover Strategy Explained: Extrusion Tooling Changeover Instructions1. Change of handling gripper: Servo + screw clamping mechanism is adopted, and the electrical program can be switched with one key during model change;2. Extrusion table change: choose a long-stroke clamping cylinder, which can be automatically compatible with different types of batteries when changing;3. Robot program: According to the size of the compatible module, the robot will follow the preset robot handling program. Before changing the model, transfer the handling program of the replacement product.3.4 Introduction of safety fence:3.4 Introduction of safety fence:1. The design, manufacture and control of the safety fence comply with the relevant national regulations on production safety to ensure the safety of the production process.2. Protective fences, fences, safety nets and other facilities are set up in places where human or machine damage may occur, and necessary interlocking protection is carried out. The safety door lock should be interlocked with the system. The safety door is self-locking and cannot be opened when the production line is working.3. Entering the security door operation process: apply for entry - the robot and other equipment are parked in a safe position - the security door is opened - enter the security door.4. Operation process for resuming production: go out of the security door - confirm that there is no one in the equipment area - close the security door, enter the recovery password, and the security door is self-locking - the equipment is operating normally. 3.5 Insulation withstand voltage test station:The insulation test before welding is conducted by pressing all probes through the overall test mechanism, and then switching between the cell and the cell through the relay. Insulation test between shell and shell; Test procedure: all positive poles in series, all negative poles in series after the insulation test between the two, and then all positive.Insulation test between pole series and housing, insulation test between all negative pole series and housing.3.6 Insulation withstand voltage test station:detailed description of the equipment:1. Operation process: the tray is lifted and positioned, the shell probe is pressed to the end plate or the side plate, and the positive probe relays of all cells are closed, so there is insulation between the positive electrode of the cell and the shell; the positive electrode of all cells is Divide into two groups, an odd-numbered group and an even-numbered group, and test the insulation between the positive electrodes.2. Model replacement strategy: According to the arrangement of the cells corresponding to the pallet arrangement, establish a coordinate system for the coordinates of the formula skipping step. Before changing the model, call up the test jump coordinate program, carry out the first piece test OK, and proceed to the production mode after the model changing.3.7 Pole photo station:Introduction of pole photo station:1. This station first takes the MARK point of the module, and then takes each pole;2. Then bind the photo information with the module code and send it to the laser welding station. 3.7.1 Equipment details: 1. The equipment is mainly composed of three-dimensional table, CCD and light source, rack cover, automatic code scanning gun;2. Action process: After the module is lifted and transferred to the pole photographing station through the double-speed chain, the 3D stage identifies the module model according to the barcode captured by the automatic code scanning gun. Find the position, and then shoot 2 MARK points on the end plate. After the positioning is completed, it will form a coordinate system, which will be sent to the cleaning station and the welding station through the PLC, and the tooling tray will flow to the next station after descending.1. The three-dimensional stage drives the camera and ranging sensor to take pictures and ranging, which can realize false capture, diameter, and straightness.2. Use template matching to roughly locate the product position, and then use a circular measuring tool to determine the center of the two circles inside and outside the pole ring for welding positioning.3. Working method: word shooting statically completes measurement and positioning, compatible with copper and aluminum materials. 3.8 Pole cleaning stationIntroduction of pole cleaning station: This station uses robots and lasers to clean the poles; 3.8.1 Equipment details:1. The equipment is mainly composed of six major parts: robot, CCD and light source, hood, automatic code scanning gun, rangefinder, and galvanometer;2. Action process: After the module is lifted and transferred to the laser cleaning station through the double-speed chain, the robot recognizes the module model according to the barcode captured by the automatic code scanning gun, and the robot program automatically adjusts the height and then performs distance measurement and MARK point photography. After the photographing is completed, each pole is automatically cleaned according to the coordinates sent by the pole photographing station. After the cleaning is completed, the tooling tray descends and flows to the next station.3.9 Laser welding stationLaser welding station introduction:1. This station first takes the MARK point of the module, and then calculates the offset of each pole based on the data sent by the photographing station;2. All busbar welding positions are measured for distance, and then laser welding is performed. 3.9.1 Equipment details:1. The equipment is mainly composed of six parts: three-dimensional table, galvanometer, CCD and light source, rack hood, automatic code scanning gun, and rangefinder;2. Action process: After the module is lifted and transferred to the laser welding station through the double-speed chain, the three-dimensional table identifies the module model according to the barcode captured by the automatic code scanning gun, and the three-dimensional table program automatically adjusts the height and then performs ranging and MARK points. Take pictures. After the pictures are taken, the busbar welding is automatically carried out according to the coordinates sent by the pole photographing station. After the welding is completed, the tooling tray descends and flows to the next station.3.10 Cantilever crane mechanism3.10.1 Explanation of Changeover Strategies: 1,Spreader replacement strategy description:1. Hook pin replacement: Hook pin and connecting plate need to be manually replaced according to different models of modules;2. Change in the length direction: the length direction is compatible, and the connection block can be adjusted directly on the aluminum profile manually.3.11 Tray introduction3.11.1 Pallet Introduction: Changeover Strategy Explained 1. Pallet replacement strategy description:1. Width direction type change: manually change the position of the side stop (the bottom plate of the tray will be prefabricated with different types of holes);2. Change in length direction: manually replace the position of the card slot of the front block directly. Industry Application Lithium battery module fully automatic assembly line is mainly used in the production of new energy lithium battery modules, Prismatic battery modules, energy storage battery modules, power battery modules and pack welding assembly, etc. Company Profile FAQ1. How many days do you need to produce this machine?This is specially designed machine according to your specific requirement. From engineers designing to production completion, it needs about 45-55 days.2. What does your factory do regarding quality control?We pay much attention to quality control from the very beginning to the end. Each machine is assembled and carefully tested before shipment.3. What's your machine quality guarantee?Quality guarantee time is one year. We choose world famous brand components to keep our machine in perfect working condition.4. Could you give installation and commissioning overseas? How long will it take?Yes, we supply overseas service, but customers need to pay for the engineers flight tickets and hotel, food.Small machines usually takes 5 days, while big machines usually takes about 20 days.5. How can I trust you to deliver the right machine as I ordered?We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation, quality, integrity and efficiency.If the machine is not suitable for your workpiece, please tell us the following information: 1) What kind of workpiece will you clean? 2) The size of workpieces(length, width and height of maximum workpiece,Length, width and height of minimum workpiece?) 3) How many the weight of maximum and minimum workpiece? 4) Please tell us your requirement cleaning efficiency? According to your infomation, the most suitable machines will be designed for your workpieces.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.