IPDB › China Industry › Manufacturing & Processing Machinery › Ice Machine
Adjustable Continuous & High-Capacity Flake Lce Machine Complete Unit1
Ice Machine, Industrial Ice Machine, Ice Making Machine
Ningbo Grant Refrigeration Equipment Manufacturing Co., Ltd
Preview:
Product Description Product ParametersOutside Dimensions TableModellce Storage BinIce Storage CapacityDimension of lce MachineDimension of lce Storage BinL1W1H1L2W2H2FF0.3ARCX400400kg1090mm700mm745mm1258mm1096mm1160mmFF0.5ARCX400400kg1250mm750mm840mm1258mm1096mm1160mmFF1ARCX800800kg1320mm1050mm890mm1328mm1393mm1360mmFF1.5ARCX800800kg1320mm1050mm965mm1328mm1393mm1360mmFF2ARCX800800kg1320mm1050mm1130mm1328mm1393mm1360mmFF2.5ARCX12001200kg1600mm1050mm1210mm1608mm1393mm1460mmFF3ARCX12001200kg1600mm1050mm1290mm1608mm1393mm1460mm Technical ParameterModelIce Storage Capacity/24hoursCondenserPowerCurrent DrawWiringWater DemandWater Pipe Ext ThreadsDrainpipe External Dia.Net WeightFF0.3AR0.3TAir-Cooled1.7KW3.7A5X2.5mm213L/H3/4"GASφ21mm180kgFF0.5AR0.5TAir-Cooled3KW6.4A5X2.5mm221L/H3/4"GASφ21mm220kgFF1AR1TAir-Cooled4KW7.9A5X2.5mm242L/H3/4"GASφ21mm275kgFF1.5AR1.5TAir-Cooled5.1KW9.7A5X2.5mm263L/H3/4"GASφ21mm300kgFF2AR2TAir-Cooled6.5KW12.2A5X4mm285L/H3/4"GASφ21mm390kgFF2.5AR2.5TAir-Cooled9.6KW17.5A5X4mm2105L/H3/4"GASφ21mm410kgFF3AR3TAir-Cooled11KW19.8A5X4mm2125L/H3/4"GASφ21mm530kg Detailed PhotosProduct ApplicationCompany ProfileFAQQ1.What is the delivery time?A: 2 weeks for 0.3-3ton,5-6 weeks for above 5ton ice machine.Q2. Is customization available?A:Yes.We can provide customization serices according to customer requirement.Q3:What payment methods are supported?A:The most common is a 30% in advance, with the remaining 70% due before shipment.Q4:Installation &commissioning:1. Customers can install the equipment themselves following the manuals, online instructions, and live video conferences provided by GRANT.2. Installation by Grant engineers is available. When purchasing machine over 5tons, Grant will arrange 1~2engineers, depending on the project size, to visit installation sites for final supervision and commissioning.a. Customers are responsible for providing all expenses of the engineer during installation include transportation.b. Power, water, installation tools, and spare parts must be prepared before Grant engineers arrive.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.