IPDB › China Industry › Manufacturing & Processing Machinery › Other Manufacturing & Processing Machinery
Ht100 Manual Electric Hot Tapping Machine for Pipeline Renovation1
Other Manufacturing Processing Machinery, Tapping Machine, Hot Tapping Machine
Cangzhou Zhuohao Machinery Equipment Co., Ltd.
Preview:
Product DescriptionList of Models of Hot Tapping MachineModelRange of Hot Tapping SizeFeed ModeFeed VolumeWorking Stroke Spindle SpeedMotor PowerMotor VoltageTapping TimePressure Flangemm/inchmm/rmmRPMKWVminHT50DN25-DN50 3/4''-2''Manual1.5170/240///10-20PN10/16HT100DN50-1002''-4''Electric0.07-0.2300530.7522015-30PN10/16/25HT200DN100-DN2004''-8''Electric0.07-0.2400401.522015-30PN10/16/25HT200DN50-DN2002''-8''Electric0.07-0.2400401.522015-30PN10/16/25HT300DN100-DN3004''-12''Electric0.07-0.2540401.5220/38015-30PN10/16/25HT400DN250-DN40010''-16''Electric0.07-0.15600301.538015-40PN10/16/25HT600DN500-DN60020''-24''Electric0.05-0.180025438030-60PN10/16/25First, weld a short section with a flange (or threaded) valve under pressure on the equipment or pipeline. Then, connect the pressure tapping machine to the flange valve and open the valve. Next, bring the pressure tapping tool into contact with the equipment and pipeline that need to be tapped through the valve. Finally, enter the cavity formed by the connection of the short section, the valve, and the pressure tapping machine to the base. According to the design pressure of the pipeline to be drilled, carry out pressure testing and air tightness testing. After the pressure test is qualified and approved, rotate the tool to make holes on the corresponding equipment and pipeline. After the hole is successfully made, withdraw the tool and the U-shaped pipe wall brought out by the hole, and withdraw into the space of the pressure-tapping machine chassis outside the valve. Then close the valve, release the pressure of the pressure-tapping machine and disassemble the pressure-tapping machine The pressure tapping was successful.Engineering CasePackaging & ShippingStandard export packing:Wooden case packing or as customer's requirementFAQQ: What's the lead time for orders?A: Standard models ship in 15–30 days; customized units require 30–45 days. Q: Can I request a customized products?A: Absolutely! We offer tailored attachments. Q: What transportation can be provided?A: International Express,including Fedex,UPS,TNT,DHL,etc and sea shipping. Q: What material is the product made of?A: Our products material is Chrome Steel. Q:What terms of payment can you supplied?A:T/T,Western Union,L/C and other payment method. Q:What countries can you export to?A:We can deliver the goods to countries in Asia, the Middle East, Africa, Europe and South America.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.