IPDB › China Industry › Manufacturing & Processing Machinery › Mining Machinery
Zdl410 Underground Mining Bucket Capacity 4.5m³ Underground Loader1
Mining Machinery, Underground Loader, Mine Underground Loader
QINGDAO ZONGDA MACHINERY CO., LTD
Preview:
Product DescriptionZDL410 underground loader : Trackless shovel loading short distance transportation equipment.ZDL410 underground loader mainly used in conjunction with mining trucks in underground excavation and mining operations. Shovel loading of ore and various materials can greatly improve operational efficiency and is an important equipment for achieving trackless mining.1.Technical Characteristics:Power System: The power system adopts a VOLVO water-cooled low pollution,low speed, and high torque engine;Transmission: The power transmission system adopts DANA gearbox and torque converter, DANA spring brake hydraulic release drive axle, mining cutting resistant pneumatic tires, and has an automatic shifting system;Braking System: The service brake adopts wet multi disc spring brake and hydraulic release brake; MICO filling valve and brake valve; The parking brake adopts spring brakes on the drive axle for braking,Frame: The frame is a central articulated structure, with the rear axle swinging left and right around the center of the frame to improve the adhesion performance of the entire machine;Steering:The steering system is a hydraulic power steering system with dual sided steering cylinders;2.Safety Measures:Safety Gear: Operators must wear safety helmets, carry self-rescue devices, and use mining lamps when entering the well.Regular Maintenance: Regular inspections and prompt addressing of hidden dangers.No Maintenance During Operation: Strictly prohibited to conduct maintenance while the machine is running.Safety During Welding/Cutting: Confirm absence of flammable or explosive materials before maintenance.Exhaust Pipe Precautions: Avoid physical contact with the hot exhaust pipe.Hydraulic System Maintenance: Pressure must be relieved before starting any repairs.Application conditions for the ZDL410underground internal combustion loader:1. Tunnel Specifications:Suitable for tunnels with a cross-sectional size of 5 meters (height) x5 meters (width) and above.Requires a firm top plate.Minimum turning radius of≥ 9 meters on the outside.Road slope should be ≤14°.Adequate ventilation and drainage in the workplace.2. Environmental Factors:Ambient temperature within the tunnel: -5℃ to 40°℃.Maximum relative humidity (at 25C): Not more than 85%.Altitude of usage location: Not exceeding 1000 meters.In high-altitude areas (above1000 meters), power reduction is required for operation.3. Fuel Requirements:The sulfur content of the fuel used in this machine must not exceed 0.2%.4. Safety Precautions:Strictly prohibited in places with flammable and explosive gases (such as gas and coal dust).Technical ParametersRated load capacity:10t(Full load)Bucket capacity:4.5 m 3Maximum driving speed in first gear :5.5 km/hSecond gear:10.2 km/hThird gear:17.5 km/hFourth gear:31.7 km/hWorking time:14 secondsMaximum traction force:200 kNMaximum shovel force:188 kNTurning radius:3408±200 mm on the inner sideOuter 6700±200 mmMaximum unloading height:2050 mmMinimum unloading distance:1650mmMaximum unloading angle:39°Steering angle:±42°Minimum ground clearance:380mmOverall dimensions (length x wide x Height: 9850 mm x2588 mmx2380 mmOperating weight of the entire machine:29000±500 kgEngineEngine: VOLVO TAD1151VE water-cooled low pollution engineRated power/rated speed:265 kW/2100 r/minStarting method: Electric startingExhaust gas purification method: catalytic purification methodThrottle control: Williams electronic throttle controllerTransmission systemTransmission model:R36000Torque converter model:C5500Drive axle model:DANA 20DTire: 18.0-25R smooth inflated steel wire tireBraking systemBrake pump: 28 ml/rService braking:Wet multi disc spring brakeBrake valve model:MICOParking brake: Spring brake on the drive axleSpring Apply, hydraulic brake releaseSteering systemType: Central hinge, hydraulic steeringSteering pump:75 ml/rSteering cylinder diameter/rod diameter x Number of cylinders: φ125/φ70 mm x twoSteering multi way valve: Parker electro-hydraulic control K170LSWorking systemWorking pump:75 ml/rWorking multi way valve:Parker electro-hydraulic control M200LSLift cylinder diameter/rod diameter x Number of cylinders: φ160/φ 90 mm x twoBucket cylinder diameter/rod diameter x Number of cylinders:φ200/φ 110 mm x oneElectrical systemSystem voltage:24VDC Starting motor voltage/power:24V/6kW Lighting:4 Front headlights,2x75W,24V 2 Rear headlights,2 x 75W,24V 1 Cab ceiling light,24 VFuel tank capacityHydraulic oil tank:300 LFuel tank:300LTransmission:36LDrive axle main transmission part:17LxtwoDrive axle wheel reduction part:3.5Lx fourEngine lubricating oil:28LTECHNICAL DRAWING AND DIMENSIONSCompany ProfileQINGDAO ZONGDA MACHINERY CO., LTD is a professional manufacture focusing on research and development, production, sale and service of underground mining machinery, a solution supplier and a mining project contractor in China with strong comprehensive strength and rich experience in mining industry.We have more than 30 professional and experienced mining experts and engineers and 200 staff for R&D, Production, QC, After Sales Technical Support and etc.We have fulfilled our commitment to turn knowledge into value by delivering a comprehensive range of integrated equipment and services that cost-effectively transform ore bodies into high grade mineral products for customers.Packaging & ShippingFAQ1. What mechanical products do you mainly produce? Are there any industry-specific orientations? A:We are producing underground mining vehicles and spare parts for metal mines.2. Can the technical parameters and specifications of the products be customized? What is the customization process? A: Yes. 3. Does the quotation include freight, tariffs, or insurance? How to choose trade terms (FOB, CIF, EXW, etc.)? A: Our quotations usually under CIF terms include Freight and Insurance but no Tariffs. 4. What is the production cycle for regular orders? Does expedited production support? A: 1 or 2 months usually. Yes and there are stock available sometime. 5. How is transportation arranged? Is door-to-door service provided? A: Our forwarder partner will arrange the proper transportation solution and can arrange the door-to-door service as well. 6. How to handle goods delay or damage? Is there a compensation policy? A: We have special and detailed warranty policy.7. Are customs clearance and customs declaration documents complete? Can you provide a Certificate of Origin (CO) or FORM E, etc.? A: Yes. 8. What payment methods are supported? A: TT Bank Transfer is preferred. 9. How long can production or delivery be arranged after payment? A: 1 to 2 months usually. 10. Do you accept Letters of Credit (L/C)? What are the requirements for L/C terms? A: Yes, but only LC at sight.11. If there is a quality problem, how to apply for after-sales service? Is technical support provided?A: We have both local and online technical after-salves service provided.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.