IPDB › China Industry › Manufacturing & Processing Machinery › Spraying Machinery & Spreading Equipment
The Best Chinese Thermal Spraying Equipment Hvof Hv-8000h Equipment Compressor Cavity Coating Machinery Needle Valve Coating Machinery1
Spraying Machinery Spreading Equipment, Hvof, Blade Coating
Zhengzhou Lijia Thermal Spray Machinery Co., Ltd.
Preview:
Product Description HV-8000H Supersonic Flame Spraying Equipment IntroductionThe HV-8000H supersonic flame spraying developed by Zhengzhou Lijia is a new type of HVOF system that uses aviation grade kerosene as fuel. The basic principle of it is to fully atomize the kerosene with the combustion aid oxygen through the atomizing nozzle to form a combustible mixture and enter the combustion chamber. The ignition system ignites the high-temperature and high-pressure gas, which is ignited and burned by the Laval nozzle to form a high-temperature and high-pressure supersonic flame flow. The powder feeding system sends the powder material from the low-pressure area into the flame flow, and after heating and accelerating, it is sprayed onto the surface of the work piece to form a high-quality coating.HV-8000H Supersonic flame inner hole spraying control cabinetHV-8000H equipment panel settings are all operated through the touch screen, with 12 powerful functional modules that are internationally leading, all kinds of common operations, information display and fault alarms are readily available, and are very in line with the user's operating habits, simple and easy to use, stable quality.ProjectParameter program controlFull closed-loop PLC controlInterface control12 inch touch screenGas flow controlWorld renowned brand quality flow controllerInput power5000WKerosene pressure1.2-1.5MpaKerosene flow rate0~12GPHOxygen pressure1.6-2.0MpaOxygen flow rate0~2300SCFHHydrogen pressure1.5MpaHydrogen flow rate0~100L/minCarrier gas pressure1.2MpaCarrier gas flow rate3~30L/minNitrogen pressure1.6MpaNitrogen flow rate10~100L/minOrigin of accessoriesGermany, United States, Japan, Italy HV-8000H Multifunctional interface HV-8000H Control Interface HV-8000H Process storage, call interface HV-80S Kerosene supersonic flame spray gunItemParameter Flame speed2000m/sflame temperature3000oCSpray rate0-9.6kg/h(WC-CO) Powder particle velocity600-1100m/sporosity≤1%Coating bonding strength≥70MpaSpray powder particle size-30+5μm,-38+10μm,-45+15μmCooling methodHydro-coolingCooling water flow rate2.3m3/hSize/Weight450*85*170mm, 4.5kgC-1000DA dual tube weighing powder feederProjectParameterPowder delivery methodScraper discQuantity of powder delivery tubes2 unitsOperation methodPLC+touch screenGas control modeEuropean and American imported quality flow controllerPowder cleaning methodBucket body flip typePowder cylinder modeSingle tube typeSelf cleaning functionhaveSingle powder cylinder capacity3LSending powder gasnitrogen or argon Powder delivery air pressure0.15-0.5MpaCarrier gas flow rate0~15L/minPowder delivery speed0~280g/minPowder delivery accuracy±1%Powder size5~150μmKM-80 Oil pump storage systemProjectParameter Input power supplyAC380/3P/50Hz±5%Input power1.5kwVolume200LKerosene managementCirculating conveying+stable oil presser(1.3Mpa)Supporting componentsOil inlet and outlet pipesOil pump motor and oil pump headWorld renowned brandsOil pump size/weightFuel tank size/weight810*510*460mm, 55kg 510*450*1170mm, 28kgService PlanTechnical data provisionA set of equipment user manual.Equipment fault analysis and troubleshooting guidelines. Warranty periodThe shelf life is 12 months after the equipment passes the acceptance inspection. The date of passing the acceptance shall be calculated from the date of signing the acceptance report by both parties. Human error includes: equipment damage caused by incorrect installation/operation is not guaranteed (our technicians will cooperate with the buyer to solve the problem).Equipment maintenance and spare parts supply after the warranty periodZhengzhou Lijia will continue to provide technical support and spare parts supply to customers after the warranty period, ensuring a response to customer equipment troubleshooting requests within 24 hours, and will also provide equipment spare parts at a low price.Buyer's on-site installation If it is necessary to install in the workshop of the Buyer's country, the Buyer shall be responsible for preparing the surrounding facilities necessary for equipment operation and providing corresponding services before the arrival of the equipment, including circuit preparation, clean compressed air and pipelines, fuel, gas and pipelines, installation tools, water pipes and handling labor. The installation time largely depends on the buyer's on-site preparation and assistance to the installation personnel.Training includes:System operationSystem maintenanceSpecial operation training (service upgrade)
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.