IPDB › China Industry › Industrial Equipment & Components › Valve
Factory Directly/Replacement/3we6a, 3we6b, 4we6d/Hydraulic Valve/ Manufacturer Solenoid Valve 12V, 24V, 220V1
Valve, 3we6b, 4we6d/Hydraulic Valve/ Manufacturer Solenoid Valve 12V, 24V, 220V, Hydraulic Valve Customized Replacement Rexroth, Hydraulic Control Valve Factory Directly
Feiyang Science and Industry Co., Ltd.
Preview:
Product Description Product DescriptionThe main feature of the WE6 type electromagnetic directional valve is that the thread of the magnetic sleeve is directly screwed with the upper thread of the valve body, which is generated when the electromagnet is energized and drawn.The thrust directly drives the reversing slide valve for reversing motion, controlling the oil flow to start, stop and reverse.The valve is mainly composed of a valve body, one or two electromagnets, a spool and one or two return springs.When the electromagnet is not energized, the spool is reset to hold in the median or starting position (except for pulse valves). The wet electromagnet realizes that when the electromagnet is energized, the force of the electromagnet acts on the spool through the push rod. On, push it from the stationary position to the desired. The working position of. Make the oil flow from P to A and B down or from P to B and A to T. When the electromagnet is powered off, the spire is pushed back to the original by the reset ZE Start position, at which point the manual button can be pushed to make the spool move.Company ProfileOur manufacturingWe have a wide range of advanced manufacturing equipment,includingAll kinds of CNC lathesMilling MachinesBoring Machines Slotting MachineSawing MachinesQuality Inspection EquipmentValve Testing SystemAutomatic Welding MachineSandblasterWe maintain strict supplier control:All suppliers have to provide quality certificateAll materials must have test/source reportsOnly use genuine seals,e.g.,Parker,Merkel,HalliteInspection and Testing1.We have a professional quality control department, every step from raw materials to finished products is in the same factory, and every procedure will be tested by professional inspectors.2.Each spare part will be measured and cleaned prior to assembly of the hydraulic cylinder. After the hydraulic cylinder is assembled, the pressure test will be carried out one by one. During the nearly one-hour test, we ensured that the test pressure was 30%-50% higher than the rated pressure. Each hydraulic cylinder must be tested without any leakage. Packing and ShippingMinimum order quantity: 1PCPacking: Just in caseTerms of delivery: 1. by sea; 2. Air transport; 3. Express to the door,Payment method: D/P L/C D/A T/TFAQ 1. Are you a factory or a trading company?A: We are Hydraulic & Pneumatic equipment manufacturer based in Wuhan, China.We are a subsidiary of Wuhan Hongda Hydraulic Co., Ltd., established in 2024. As an important member of Hongda, Feiyang Technology is dedicated to promoting the development of Hongda Hydraulic in overseas markets through innovative technology, high-quality products, and excellent services.Q: 2. Do you accept OEM? What is your minimum order quantity? Do you have OEM experience?A: We accept OEM for every product that we produce, there is no MOQ for any of our product if you wanted a OEM, We've been doing OEM ever since the year we established our factory, which is 1999. We have a mature technical team ready to discuss your unique requirements with you.Q: 3.ls your delivery always on time?A: We can't promise about the freight but what we can do is shortening our lead time while keep the same quality level. Therefore, it will not be any problem even if the sea freight delay for a couple days.Q: 4. Why don't you have CE certification?A: CE certification is for one product, not the whole factory, and we have way too many product lines to registered CE for, but our customers from Europe said it's easy to solve the CE problem. And we are working on the CE certifications registration process, in order to save our customers' time in the future. By the way, there are many products with fake CE Certification on the market, please be aware with that to avoid unnecessary problems.Q: 5. How do l start to order?A: First, talk to our sales about your machine model, working conditions, technical requirements, deadlines. Then, our sales will provide the details you need. All inquiry will be responded within 24 Hours.Q: 6. Can you tell me the latest situation of order production process?A: Of course, unlike others who might hide their production process, our production process is totally open for our customers. Feel free to inform our sales about your needs.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.