CIPDB › China Industry › Metallurgy, Mineral & Energy › Metallurgy Machinery
High-Efficiency and Energy-Saving Heat Treatment Electric Quenching Furnace1
Metallurgy MachineryElectric FurnaceQuenching Furnace
Luoyang Zhongtai Industries Co., Ltd.
Preview:
Product Description High-Efficiency And Energy-Saving Heat Treatment Electric Quenching Furnace Product DescriptionManual of electric quenching Furnace Electrical appliancesWarning elimination I-Zone heating Furnace operation knob Furnace mouth upwardsFurnace mouth downwards Electrical appliancesHeat preservation timekeepingI-Zone heatingFurnace operation knob Furnace mouth upwardsFurnace mouth downwardsBrief Introduction about how to dry off the furnaceAt the first time to use the furnace, need to dry off the furnace firstly. 0-200oC 12 hours200oC-400oC 8 hours400oC-650oC 6 hours650oC-850oC 3 hours850oC-900oC 2 hoursNote:Standard dryoff the furnace according above time range can extend equipment lifespan .Introduction of electric quenching FurnaceCheck the equipment operation and electrical appliances, infusion solution before charging.Turn on the tilt switch after confirm that the device is normal ,the furnace body is upwards 45°(keep the furnace mouth upwards)After the angle adjustment of the furnace body, make the workpieces(screws) are filled, move the equipment shaft to a flat position and close the furnace door , then open the ignitron tube valve of the furnace door.Confirm the furnace door is in place and sealed,manually adjust the temperature control instrument(workpieces need to be heated ),then turn on the heating switch to heat ,and then turn on the rotary switch start to work ,then furnace start to rotate and heat .When heating temperature of the I-zone shows 450oC-500oC, can infuse protection medium(industrial alcohol or other infusion solutions), rotate the infusion flowmeter knob to the corresponding place, during 5-10 minutes after infusion , if no flames are seen from the ignition tube of front furnace door ,should be manually lit the ignition tube with a match or lighter. After the flame came out, it's normal from the ignition tube.Customer can manually adjust the infusion solution flow .When heating temperature of the I-zone shows 780oC-800oC, can infuse carburizing medium(kerosene or other carburizing solutions). Then rotate the kerosene infusion flowmeter to the needed flow of the furnace.Customer can manually adjust the infusion solution flow .It is time to discharging when the workpieces in the furnace are heated and the heat preservation meets its requirements. Turn off the protective atmosphere medium and carburizing medium, no flames are seen from the ignition tube of front furnace door, turn off the knob , open the furnace door. Turn on the tilt switch, tilt down 90°,the workpieces are directly poured into the oil pool for oil quenching.(Note: After tilt down , also can press the furnace operation knob to make the workpieces poured into the oil poor quickly. Depends on the actual working area to operate.The workpieces must be poured into the material box in the oil pool, so as to make the next queching easily. )After the workpieces in the furnace are fully poured, make the furnace body upward 45°, refill the workpieces.After the workpieces in the oil pool reach the oil quenching time (about 10 mins or make the workpieces out according to the corresponding working flow requirement ), put in the tempering furnace to temper .If the workpieces only need quenching, do not need carburizing operation, other processes keep the same, only do not use carburizing medium is ok . The carburizing temperature need to keep in 900-930oC. Quenching temperature 830-880oC. Normally, the carburizing heat preservation time is 3-5hrs, quenching 2-3hrs. Product Parameters Model No.RGR45-9Rated power45KWRated voltage380V/3phasesRated temperature950°C (controlled)Instrument temperature control accuracy±1oCTemperature control partition1control modePid automatic mobilization, solid state relayheating elementHelical resistance wire ocr21A16NbFurnace pipe material10mm 310S stainless steel(2520)Heating element connectionYFurnace tank sizeΦ520×680mmHeating area1Discharging wayaxial dischargeCooling modenatural coolingfurnace tank material310S heat-resistant stainless steelOverall dimensions(L*W*H)φ1850*2000Capacity120~130kg/furnaceWeight of the furnace2.5ton Company Profile FAQ Q: Why we believe in luoyang zhongtai industries co., ltd:A: 1. More than 30 years experience. 2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts 3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates. Q:Delivery time:A: Parts lead time 1-2months, machines 2-3months. Q:Payment terms:A: Accept payment type: T/T, L/C, Western union,Cash.30% deposit when signed contract. Full payment paid before shipping Q: Quality warranty?A: Guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply. Q: After sales service?A: We can supply technical guide for machines running test and parts maintenance if end user needs.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...