Send

Food Packaging Bag

Gift Box & Bag

Industrial Packaging Bag

Logistics Packaging

Machinery for Packaging Supplies

Non Woven Bag

Other Bags & Cases

Package & Conveyance

Package & Printing Service

Packaging Bags

Packaging Materials

Packing Bottle

Packing Machinery

Post-Press Equipment

Pre-Press Equipment

Printing Machinery

Printing Materials

Shopping Bags

Specialized Case & Box

Stencil

Tag & Sign

Tag Gun

Tool Packaging

Watch Box

CIPDBChina IndustryMetallurgy, Mineral & EnergyMetallurgy Machinery



China, Chinese Blast Furnace Top Gas Recovery with Equalizing Pressure1 Industrial Products Supplier Manufacturer Details, price list catalog:

China Products Details Supplier Manufacturer price list catalog
« Previous Next »

Metallurgy MachineryPusher Type FurnaceSteel Smelting

Shanghai Prime Metallurgy Technology Co., Ltd

Preview:

Product Description  Product DescriptionResearch and Development BackgroundIn recent years, the global trend towards a low-carbon economy and the increasingly severe climate issues have garnered significant attention. China has proposed the construction of resource-conserving and environmentally friendly enterprises. In the metallurgical industry, the energy consumption and pollution generated by blast furnace ironmaking account for a large proportion of the entire steel production process, making it a key target for energy-saving and emission reduction measures.During the blast furnace smelting process, the equalizing gas in the top bin of the furnace is usually discharged directly into the atmosphere after passing through a cyclone dust collector and silencer. This gas contains a large amount of CO and dust, making it a toxic and combustible mixture that pollutes the atmosphere, especially the blast furnace production area, while also wasting energy.Our company's research and development of the blast furnace top gas equalizing pressure recovery technology has been successfully applied to multiple blast furnaces with good results. The technology quickly recovers costs and addresses issues such as high dust content in discharged gas, large pressure fluctuations, short lifespan, and pollution of the clean gas network, which were difficult problems for previous gas recovery technologies. This technology meets environmental protection requirements.Process FlowApplication ScopeThe furnace top balanced pressure coal gas recovery device does not occupy the limited space of the furnace top or increase the load of the furnace top frame. It features a simple structure, easy arrangement, and high safety:At the same time, it has good dust removal effect, recovers clean coal gas, and the recovered gas directly enters the clean gas pipeline network. It minimally pollutes the clean gas pipeline network and has almost no impact from pressure fluctuations, thus maximizing the reduction of toxic gas emissions and achieving true environmental protection.This technology can be applied in new construction and renovation projects. Project sites are usually limited and narrow. This recovery device can be used for new construction or can be retrofitted to existing surplus dry dust removal systems with simplified design.Process SelectionThe balanced pressure coal gas recovery process is divided into two types: partial recovery and full recovery.Partial RecoveryBefore charging the furnace top bunker of the blast furnace, the pressure inside the bunker is consistent with the furnace pressure, in a high-pressure state. The coal gas recovery device connected to the atmospheric coal gas pipeline network maintains atmospheric pressure inside. By opening the coal gas recovery valve between the bunker and the recovery device, gas discharged from the bunker is recovered using natural pressure differentials. When the pressures inside the bunker and the recovery device meet the conditions for opening the charging valve or achieve balance, the coal gas recovery valve is closed, and the recovery process ends. The remaining gas in the bunker, close to atmospheric pressure, is released according to the blast furnace charging procedure to reduce bunker pressure to less than 5 kPa. This process is known as 'partial recovery'.Full Recovery, after the partial recovery processMethod 1: Using a jet pump device, residual pressure coal gas in the bunker is driven into the recovery device using high-pressure clean coal gas through jet suction effect. After the bunker pressure drops below 5 kPa, jet suction is stopped, the coal gas recovery system valves are closed, and the upper dense valve is opened for charging.Throughout this process, the release valve remains closed, preventing gas release from the intermediate bunker and achieving full recovery of the gas.Method 2: Using a hot blast stove smoke backflushing process, atmospheric pressure coal gas in the bunker is driven into the balanced pressure coal gas recovery equipment, achieving full recovery of balanced coal gas and zero emissions of CO. After backflushing, smoke from the bunker still needs to be released to reduce bunker pressure to less than 5 kPa.This process utilizes backflushing to achieve maximum recovery and utilization of coal gas.Technical LevelThe main design technical specifications of the balanced pressure coal gas recovery device are as follows (specific indicators vary with different process forms):★ Meets gas purification requirements, gas dust concentration <5 mg/Nm3.★ Full recovery of coal gas; balanced pressure release valve remains closed, zero emissions from balanced pressure release (bunker pressure below 5 kPa).★ Equipment operation noise <85 dB(A) (valve noise).★ Construction and operation of the balanced pressure coal gas recovery system do not affect the normal production of the original gas purification system and blast furnace process system.★ According to actual blast furnace production processes, charging batches, and times, reasonable planning of recovery time, injection time, and design of balanced pressure recovery systems and dust collectors ensure that blast furnace production is not affected.Technical FeaturesTechnical Challenge - Condensation Water Issue:After the blast furnace coal gas balanced pressure recovery system is put into operation, during the recovery process, which involves pressure reduction and cooling of the blast furnace coal gas, moisture in the gas can condense and combine with dust in the blast furnace gas, forming a viscous wastewater mixture.ImpactsBonding of filter bags, reducing their lifespan, affecting gas purification efficiency, and failing to meet environmental purification requirements.Periodic ash removal from dust collectors results in wet ash that cannot be discharged properly, causing significant impacts on pneumatic conveying or other ash discharge methods.SolutionOne solution is the application of the intermediate bunker of the blast furnace top charging equipment with Patent Certificate No. ZL201921943859.0, utilizing companion heating technology;This technology maintains the recovered coal gas above a certain temperature at all times, preventing condensation water formation and thereby protecting filter bags.Ultimately, it achieves truly dry ash removal, meeting any ash discharge or conveying requirements effectively.Application of Injection TechnologyBased on the familiarity and understanding of blast furnace production processes by our professional team, the design of the balanced pressure recovery system is specifically tailored to the production rhythm of existing blast furnaces. The design and planning of the recovery process ensure that it does not affect the charging rhythm of the blast furnace.Thorough verification and theoretical validation are conducted for the injection system and the medium used for injection in existing blast furnaces (such as high-pressure coal gas or fluorine gas). This is done in conjunction with successful operation practices of multiple balanced pressure recovery systems, ensuring effective injection and achieving full recovery.Idle Blast RecoveryIdle blast in a blast furnace refers to temporarily ceasing the operation of supplying air into the furnace, which is a necessary measure in iron smelting production.Using a bell-less top device, in previous idle blast operations, raw coal gas and dust were directly discharged into the atmosphere for durations ranging from 5 minutes to 30 minutes or longer (according to process requirements). Typically, after reaching a certain pressure value, the furnace top or gravity dust removal release valve is directly opened for gas release operations. Although the emission rate meets requirements, it can lead to yellow smoke emissions from the blast furnace top or gravity dust removal components.The objective of this particulate matter control project is to address the unorganized and disorderly emission of smoke and dust during blast furnace top releases. It proposes an efficient and reasonable solution using the principle of jet suction to improve current idle blast operations effectively.This plan involves constructing a new idle blast pipeline, modifying the balanced pressure coal gas recovery dust collector housing and jet suction device for idle blast gas recovery operations. Above the shut-off valve of the coarse gas pipeline at the entrance of the gravity dust collector or in front of the furnace top release valve, a new idle blast coal gas recovery pipeline entrance and matching valves are installed. The advantage of the interface in front of the furnace top release valve is that it eliminates concerns about coating inside the pipeline, and the furnace top platform can serve as the valve layout operation area without the need for a new valve platform.The newly constructed idle blast connection pipelines and valve groups are all connected to the existing balanced pressure coal gas recovery pipeline, then introducing gas into the existing blast furnace gas bunker balanced pressure recovery dust collector, retrofitting this balanced pressure recovery dust collector to save investment.For the dust collector outlet modification, two new recovery pipelines are built. The first recovery pipeline directly connects to the low-pressure network. When the idle blast coal gas pressure is higher than the low-pressure network, natural recovery operations are conducted. Utilizing the pressure difference, the purified blast furnace gas flows naturally into the low-pressure pipeline, and the original blast furnace gas bunker balanced pressure recovery can also use this pipeline. When the pressure is below 30 kPa, the valve of the first recovery pipeline is closed, and gas is introduced into the second recovery pipeline. The second recovery pipeline is a jet suction pipeline that uses high-pressure ammonia gas for jet suction operations. High-pressure ammonia gas from the existing ammonia gas pipeline is introduced into a newly constructed nitrogen tank of 10~15 m3 (determined based on blast furnace volume), and jet suction operations are conducted through pressure reduction and valve adjustment to collect the remaining gas into the low-pressure network. The entire system and recovery pipelines can be renovated using the existing balanced pressure recovery system and pipelines, which results in low investment, good effectiveness, and minimal operating costs and nitrogen gas consumption.Zero Emission of Blast Furnace GasIn the original blast furnace production process, the system for gas release through the release tower is reformed. Through collaboration with Shougang Environmental Protection Department's patented technology, a water sealing device is added to achieve zero leakage of gas during normal operation. Company ProfileCompany ProfileVisionWith dees of rapid development and accumulation, China has been perfect and mature on technology and management in various industrial areas, shaping a complete processing manufacturing industry with competitive price, well known for its excellent skill, high efficiency and hardworking team with qualification for personnel dispatching.At the time of economic globalization, it is our consistent target and objective to integrate and export all kinds of technology, management mode, engineering project and manpower as per the actual requirement of our client With our own abundant technical strength, superior integration capability of technology and resources, well experienced of project implementation and management as basis and platform;Let China go out to the world, and make the world know of China;ProfessionalProfessional technical and management team with abundant experience in the implementation of domestic and international projects;ResponsiveResponsively and meticulously, translating your needs into complete solutions;IntegrationIntegrating various technologies and resources in China and fulfilling complementary advantages, by relying on professional teams;MotivationMotivated to provide the optimal solution and quality products;ExceptionalExceptional, delivery and,implementation of projects to meet, your expectations;Our TeamProfessional technical teamPrime is staffed with professional import & export team skilled with the practice of import and export business, including sea freight packing, logistics organization, L/C review, cargo booking, and customs clearance, L/C negotiation, double authentication of shipment documents, etc.All above personnel are well experienced in the execution of projects in Southeast Asia and Middle East. Complete procurement mechanismOur professional team of procurement offers strict management of supplier 's qualification inspection and selection, complete system of supplier listing, rating and elimination, to ensure the supplier is qualified and capable of implementing the project and supplied with product of high quality, and maintain a healthy and good condition of credibility, contract settlement and capital flow management.Quality management systemOur complete quality management system , the process control covering from Scheme formulation , engineering technology, detailed design, to processing and manufacturing of equipment and material , ex-factory test and site erection and commissioning till it put into production, which through multi-level inspection, tour inspection, supervision and node control can ensure quality of the final product.Well experiencedExecutive team is abundant in experience of overseas project implementation with similar project working experiences, esp. experience in Southeast Asia, Middle East projects; ISO System Certification   Partners     

Link supplier or manufacturer »

Metallurgy Machinery: Blast Furnace Top Gas Recovery with Equalizing Pressure
Customized Electrolytic Polymer Cells for Electrowining/Electrorefining of Copper, Zinc, Lead, Cobalt etc7019byte
30ton 60t Metallurgy Powder Press Machine for Sintered Parts 2 Upper 2lower989byte
Best Price Slag Pot Superior Heat-Resistant Made in China Slag Container for Steel Factory Slag Bowl/Lot/Ladle/Tank/Truck Supplier5019byte
Induction Heater Cabinet Melting Furnace for Melting Gold, Sliver, Brass, Copper3957byte
Long Serive Life FRP Electrolytic Cells Polymer Concrete Cell for Metal Electrolysis7382byte

Best China Factory FRP Electrolytic Cell Electrowinning Cell Copper Electrowinning Plant2198byte
110X110X900mm R6000 Copper Mould Tube for CCM4138byte
Factory Top Cost Effective Metal Sheet Folding Machine Automatic Electric Press Brake 2500mm Stainless Steel 2.5mm CNC Flexible Panel Bender for Anti-Thief Door7391byte
Beam Blank Copper Mould Tube for Continuous Casting to Produce Steel Billet4981byte
The Laying Pipe Has a Good Curve and Is Easy to Install3122byte

Graphite Cast Steel Rolls for Section Mill1235byte
Hcr II Centrifugal Casting Rolling Mill Roll with High Chromium Composite for Rolling Mill, Temper Rolling Mill Roll and Rolling Mill Roll Ring4104byte
Ferrosilicon Furnace/Submerged Arc Furnace/Silicon Metal Furnace Saf EPC China649byte
China Factory High-Efficiency Heat Recovery Walking Beam Reheating Furnace for Slab and Billet Steel Production17508byte
1450 4hi Reversible Single Stand Cold Rolling Mill/Production Line/Machine/Equipment5573byte

Regenerative Aluminium Melting Furnace for Billet Casting Aluminium Smelting Furnace3960byte
Tilting Type Holding Regenerative Furnace Aluminum Billet Melting & Casting Production Line1538byte
Centrifugal / Spun Casting Stainless Steel High Temperature Resistant Furnace Roller, Hearth Roll Used in Cal, Cgl, CPL Heat Treatment Line Used for Steel Mill1258byte
Sample Abrasive Cutter Metallographic Specimen Cutter1972byte
Customized Pipe Hydrostatic Testing Machine Provides Hydro Testing Machine Solutions2847byte

Aluminum Cathode for Zinc Ew2074byte
High Performance Industrial Electric Melting Furnace for Melting Gold Silver3586byte
Industrial Pumps Rolling Bearing Variable Speed Hydraulic Coupling2764byte
Industrial Induction Melting Furnace for Smelting Non-Ferrous Metal8406byte
High Temperature Resistant Chinese Manufacturers Tube Oil Heater for Industrial Furnace3760byte

T70b T75-3/B T90b Metal Steel Profile Making Machined Elevator Guide Rail Processing Production Line3981byte
Copper Mould Tube for Continuous Casting Machine Mold Crystallizer for CCM in Steel Industries Tubular Molds4064byte
Hea, Heb and Ipe Rolling Mill Machine Line, Starting Process Flow with If, Eaf, Rolling Pass1616byte
Hot Working Die Steel Pheroidal Graphite Pearlite Chilled Cast Iron Rolls4660byte
Air Knife for Wet Flux Line, Zinc Plating for Thickness Control Galvanizing Equipment2238byte

Pipe Hydrotest Machine Customized Hydrostatic Testing Machine Pipe Hydraulic Testing Machine Hydro Testing Machine2847byte
Copper/Bronze/Brass Square Casting Machine for Scrap Copper with CE Cerficate9616byte
Electrolytic Cell for Copper Industrial FRP Electrolytic Cell7382byte
High Reputation T70b T Shape Customized Lift Parts Machined Elevator Guide Rail Production Processing Line3999byte
Electric Continuous Casting Machine CCM for Steel Billet Producing Vertical Type Continuous Casting Machine with Big Capacity2567byte

Tension Leveler for Cold Rolled Steel Coil8770byte
Tilting Type Holding Furnace Tilting Industrial Aluminum Melting Furnace Billet Melting1545byte
Galvanizing Sink Roll for Ccl Cgl, 316L Heat-Resisting Stainless Steels Galvanized Parts2185byte
Roll Ring of Rolling Mill/Tc Ring/Rolling Mill Roll/Roughing Stand and Finishing Stand5131byte
High Quality Manganese Alloy Melting Industrial Electric Arc Furnace649byte

Hot Sell Safety Ladle Refinery Furnace in Petrochemical Plant2950byte
Best Price Regenerative Hot Top Aluminium Billet Casting Table Machine1339byte
Bar/Wire/ Strip Rolling Mill Production Line Stands Cross Roller Table Conveyor1362byte
Fence-Type Anode for Zinc Ew1280byte
Cooling Bed of a Variety of Types for Steel Rolling Machine Production Line, Turn Key Project1617byte

1 Ton Electric Induction Melting Furnace for Melting Scrap Iron, Copper, Aluminum8406byte
Continuous Roller Conveyor Aluminum Alloy Automible Wheel Solution Quenching and Aging Heat Treatment Industrial Furnace1544byte
Spray Gun Semi-Dry Spray Repair Gunning Machinery for Refractory Materials on The Side Walls of Hot-State Converters11797byte
Backup Roll for Cold Mill1273byte
Eaf Furnace Wall Oxygen Gun Water Cooling Protection Box/ Case1484byte

Eco-Friendly Eaf Dust Recycling Waelz Process Zinc Oxide Production Rotary Kiln Supplier6947byte
China Advanced Light Burnt Dolomite Lime Processing Rotary Kiln with Flexible Capacity 100-1200 Tpd4960byte
Limestone Rotary Kiln for Active Lime Production Line4741byte
Shear Blade, Steel Cutting Blade for Steel Mill and Rolling Mill1473byte
High Speed Wire Rod/Bar Coil/Rebar Steel Hot Rolling Mill6359byte

Asccm High Efficiency Metallurgy Equipment Billet Induction Furnace Steelmaking Billet Caster Steel Continuous Casting Machine CCM1359byte
4000kVA 10tons Electric Arc Furnace for Steel Scrap Melting (EAF)5115byte
Hydraulic Power Unit for Furnace Hydraulic Systems1509byte
Lifting Magnet for Billet, Bloom, Girder Billet and Slab488byte
Shaft Kiln Furnace Price for Slag Remover Lime for Molten Steel Lime Burning Furnace Lime Vertical Kiln6948byte

Brass Spray Nozzle and Stainless Steel Nozzle, Nozzles1083byte
1450mm 8 High Stainless Steel Cold Rolling Mill5115byte
500kg Intermediate Frequency Smelting Electric Vacuum Induction Furnace for Alloys8406byte
The Special and Famous Ferrochrome Electric Arc Furnace in China649byte
High Speed Section/Channel/Angle Steel/I Beam/Wire Rod Hot Rolling Production Line1545byte

Roller Hearth Heat Treatment Line1967byte
Universal Rolling Mill Line for Manufacturing Steel Product, Melting Shop and Hot Rolling3871byte
Hot - State Repair Refractory Gunning Equipment: Minimize Downtime in Steel Production11797byte
Work Roll for Cold Rolling Mill1318byte
Auxiliary Supporting Equipment for The Main Steelmaking Equipment3424byte

Cardan Shaft, Universal Joint, Shaft Coupling, Universal Coupling for Rolling Mill1191byte
Hot Rolling Mill for Steel Wire Rod and Deformed Bar2005byte
Factory Price High Performance Manual and Automatic T Shaped Elevator/Lift Guide Rail Processing Production Line4005byte
Aluminium Melting Furnace Hot Top Casting Machine Homogenizing Furnace1783byte
Stainless Steel Mild Steel 550mm--1750mm 4hi 6hi 20hi High Speed Cold Rolling Mill Machine6401byte

China Best Nickel Smelting Furnace Ferroalloy Submerged Arc Furnace10515byte
Boot Rolls for Galvanizing Production Line1929byte
Industry Steel Ladle for Foundry Furnace Casting Ladle Steel Making Equipment2790byte
Hot Rolling Mill for Producing Angle Steel, Steel Rolling Plant1699byte
250kg 300kg Metal Melting Induction Furnace for Making High Quality Steel Factory Sale Price8406byte

Drying Furnace for Stainless Steel Tube2514byte
Electric Arc Furnace Steel Slag Debricking Machine Breaker Made in China Price11811byte
Radiant Pipe for Annealing and Galvanizing Line1186byte
Porous Water-Cooled Oxygen Gun for Converters2711byte
Rotary Kiln Lime Plant with Rotary Kiln Dryer Calcium Carbonate High-Efficiency Vertical Shaft Kiln Lime Rotary Calciner Kiln4937byte






Purchasing Agent


Note: Send your message to supplier or manufacturer.

Welcome to our Professional and comprehensive procurement services...

Message:


Post Sourcing Request Now »

  • Professiona Secured Trading Service
  • Verified Business Licenses to Supplier or Manufacturer
  • Welcome to our Global alliance Member