CIPDB › China Industry › Manufacturing & Processing Machinery › Building Material Making Machinery
Half Round Ridge Cap Roof Roll Forming Machine Roof Ridge Tile Building Material Making Machine1
Building Material Making MachineryBoard Making MachineColor Tile Making MachineTile Machine'
XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.
Preview:
Product Description Product Description (1) The general machine parameterSuitable roll forming materialColor steel sheetThickness0.4-0.6mmFeeding width457mmFrame designWall-plate-frame-design /Strong-stand-frame-designRoll stages12 stagesMaterial of forming roller45# steel, CNC lathes, Hard Chrome CoatedShafts DiameterΦ75mmMain motor power5.5KWwith reducerMax. Line speed of roll former 15m/minHydraulic Pressing/Cutting DeviceThere is one hydraulic press to make the ribs on top according to requirement and hydraulic post cut for cut offHydraulic group power11KWMaterial of cutting bladeCr12, hear treatment Electric Standard380V /50HZ/3PH or as the customer's requirementsMachine Dimensions 7650mm×1220mm×1680mmMajor Color of Machine PaintedRAL 5015 (Blue) or as per customer's requirements(2) PLC Control system PLCSiemens brand (ABB brand is available if required)Touch ScreenSiemens brand (ABB brand is available if required)InverterSchneider brand (ABB brand is available if required)Encoder Omron brand(3) Product rack Descriptionun-powered, 3 units(4) Option:1. CE certificatePlease refer to the attached pictures for details(5) Service after sellIn correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.(2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory.b) Prepare necessary electric wiring. c) Prepare material of trial running.d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly.After-Sale Service In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation:If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians. Terms Of Trade Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...