CIPDB › China Industry › Manufacturing & Processing Machinery › Building Material Making Machinery
Yx18-76-836 Roll Forming Machine1
Building Material Making MachineryBoard Making MachineTile MachineTile Making Machine
XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.
Preview:
Product Description This Producing Process Sketch As Below Picture: General Parameter1ItemParameters2Model NO.YX18-76-8363MaterialPre-painted galvanized sheet4Thickness0.4-0.8 mm5Yield Strength235 MPa6Feed Width1000 mm7Effective width836 mm8Roll Stages18 Stages9Shafts Diameterф75mm10Main Motor Power7.5 KW11Hydraulic Group Power3 KW12Max. Line Speed Of Roll FormerApprox.15 -18 m/min13Electric StandardAccording to local voltage Machine ComponentA. 5Ton*1250mm Un-coil Rack No power; Coil inner-diameter=500mm Load capacity= MAX.5.0Ton, Coiler Width= 1250mmB. Entry Roller One Set(Feeding Section With Guide)C. Cold Rolling Mills Feeding section with guide Gear/Sprocket driving;18 -step to form Rollers manufactured from 45#, CNC lathes, Heat Treatment hard Chrome Coated Shafts Diameter=ф75mm, Precision Machined Main motor =7.5 KW, Frequency speed control Max Line speed of roll Former: Approx.15-18 m/min Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside D. Hydraulic Cutting Device Stop to cut, Post cut, No Blanking cut Cutting tool material : Cr12, Heat treatment; Pump motor =3KWE. PLC Control System Control the quantity & cutting length automatically; Combined with: PLC, Touch Screen (Siemens), Inverter (Schneider), Encoder (Omron), etc Cut-to-length tolerance≤±2 mm Control Voltage 24VF. Product Rack Un-powered, 3 unitsAfter-Sale Service In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation:If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians. Terms Of Traded1.ackage & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...