CIPDB › China Industry › Manufacturing & Processing Machinery › Building Material Making Machinery
High-Efficiency Fiber Cement Board Production Line Fully Automated Cement Panel Manufacturing Equipment Energy Saving1
Building Material Making MachineryBoard Making MachineFiber Cement Board MachineCement Fiber Board Machine
Zhengzhou Xingruida Machinery Manufacturing Limited Company
Preview:
Product Description Fiber Cement Board Production Line1.1 Main Production Line Specifications: LXWXT:2440X1220X4-30mm(Product With Specical Specifications Can Also Be Produced As Per Requirement Of The Customer)1.2 Quality Standard :For Main Technical Performance Index Please See The Following Table: ItemUnitFiber Cement BoardDensityg/cm30.75-1.8Flexibilitympa>9Thermal Conductivityw/m.k<0.29Impact StrengthkJ/mm2>3.0Screw Extraction Forcen/mm<0.2Moisture Content%<10Vertical Flexural Strengthmpa16-22Horizontal Flexural Strengthmpa12-18Average Flexural Strengthmpa14-22Delamination Non-DelaminationMoisture Movement%0.06Shrinkage Rate%<0.09Wet Expansion Rate%<0.19Non-Combustibility Comply With Gb8624A ClassNon-Combustible Material 1.3 OtherTheoretical Capacity:3,000,000-10,000,000 Sq.M Per Year (Based On 1220x2440x6MM)Pre-Curing Time:8hDaily Production Time: 22hNumber Of Autoclaves: 3 Autoclave Specifications: Φ2X26.5mAutoclave Working Time: 24h ContinuousMaintenance Autoclave Cycle:16 Hours On Average (According To The Valuation Of Similar Factories, The Specific Materials Will Be Determined In Laboratory Tests After The Raw Materials Are Determined)Main Raw Material Reserves: Fibers Meet The 7-Day Consumption; Powder Materials Such As Cement And Quartz Powder Meet The 3-Day Consumption. The Details Need To Be Discussed.1.Q:Are you a manufacturer or a trading company?A:We are a manufacturer with 36years of experience and an international trade team. We own a 50,000 square meter manufacturing factory and we have about 150 workers. 2.Q:Which loading port?A:Ports: Tianjin, Qingdao, Shanghai, Lianyuan Port, Shenzhen, Guangzhou, etc. 3.Q:Can you provide customized equipment?A: Customized equipment can be provided according to customer requirements,we can print your LOGO or information on the machinery or packaging. 4.Q:What payment method do you usually use?A:Payment Terms:30% Advance Payment,65% Payment Before Loading,5%Payment Within 30Days After Installation; 5.Q:What is the delivery time of your equipment?A:About 120-150Days. 6.Q:How do you guarantee product quality?A:We have strict quality control checks in each process. There are test reports of our products. All our products comply with industry standards. 7.Q:Do you provide engineer installation and commissioning services? How long does it take to install and commissioning?A:Yes, we have a team of 50 engineers around the world responsible for installation and commissioning services. Installation and commissioning takes about 90-120 days.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...