CIPDB › China Industry › Manufacturing & Processing Machinery › Plastic Machinery
100ml~5L HDPE PP Bottles Jars Jerry Cans Containers Blow Molding Machine1
Plastic MachineryBlow Molding MachineBlow Moulding Machine
Zhangjiagang Apollo Machinery Co., Ltd.
Preview:
Product Description Product DescriptionAutomatic bottle making machineModel No.: ABLB75(Double station single die head)ABLB75 full automatic bottle making machine was specially designed for making plastic water bottles, medical bottles, lubricant oil bottles, cosmetic bottles, and other small plastic containers not over 5L. This design is low power consumption and very stable.The features of this machine:(1)It is suitable for producing PE, HDPE, PP, PVC, PETG, PS so on, plastic containers and bottles in all shapes are available, the max. Product volume is up to 5L.(2)Single station single die head design, very easy to operate and maintenance.(3)Most components of the blow moulding machine are from famous world brand.(4)Fully automatic process with low power consumption, high efficiency, quick and safe operation, easy for maintenance.Technical Parameters: ( ABLB75II)Extrusion systemSummarizeHigh-grade alloy steel, center feeding Die head number1 Center distance of die heads/ Max die mouth/ Heating zone3-4 Stainless steel heating cycle Heating power3~5KW Clamping systemSummarize High intension, rigidity, center mold locking, stable mould opening and clamping system Clamping force8 0KN Template distance148~568mm Max mould size 400X450mm Mould materialHigh grade 50# steel Electric systemSummarizePLC+ touch screen(man-machine interface)standard extrusion blow molding machine controlling system(AUTO monitoring, fault-alarm, auto counting ,auxiliary function available)Japanese Mitsubishi PLCsystemOperate interfaceTouch screen, automatic self-diagnose alarm system Temperature control Automatic temperature control module Movement control Japanese Mitsubishi, Chinese/EnglishVersion Electric protectionAmpere overload, electric short circuit self-protection function Hydraulic systemSummarizeMultiple function hydraulic integrated block Proportional control, high efficient Oil pump motorThree phase asynchronous motor (380V,50HZ) 7.5kw Oil pumpImported double pump ValvesImported oil pump valves and connections Oil pipesDouble layer overpressure resistant System pressure60Kg/cm2 Cooling systemSeparate water cooling cycle, oil cooler cooling system Pneumatic systemSummarizeTaiwan AIRTAC pneumatic system Air pressure0.8Mpa Air displacement0.8M3/min Electromagnetic valve AIRTAC Cooling systemSummarizeSeparate cooling system of mould, barrel and oil system Cooling mediumWater Water flow80L/min Water pressure0.3-0.6MPa The main components of the machine. ( ABLB75II )electronic parts NameTraderMicro computer control systemJapanese MITSUBISHI Temperature ControllerJapanese MITSUBISHIAuxiliary RelayOMRON contactorSchneider from FranceElectric motorSIEMENS MOTORPower SourceTAIWAN MEANWELLInverterDELTA hydraulic parts NameTraderOil pumpTAIWAN HIGH-TECHValveJAPAN YUKENOil pump and connectionJAPAN YUKENSealed partHALLITEair control system NameTraderCylinderAIRTACAir ValveAIRTACCompany ProfileCertificationsProduction ProcessRelated Products Customer photo FAQ1. Can the machine customized only for my products?Yes, most APOLLO machines can be customized as per clients' requirements, including the structure special design and brand of parts special request.2. How about the molds ?APOLLO has its own mold manufacture company for injection and blowing mold. Machine and mold can be tested for samples and smooth matching before shipping. Mold raw material is various for optional.3. What is the business item for this project ?a. Delivery Date: within 45 working days after receive the deposit and samples or drawing confirmed by buyer and APOLLO .b. Port of Loading: SHANGHAI, CHINA.c. Payment: 30% TT deposit, balance before shipment or 100% irrevocable L/C at sight.d. Container needed: One 20GP container.4. How is APOLLO after-sales service?a. InspectionBefore delivery, APOLLO takes responsibility to finish the machine in time and send the righ t samples to clients for approval. Clients also are welcome to APOLLO factory to inspect the testing of machine, so that the provided machine could be safely and smoothly put into operation once reach the client`s factory.b. Debugging InstructionAPOLLO takes responsibility to have debugging overseas, and client abroad please sends in vitation forward of time to engineer of APOLLO , provides the engineer with round-trip tickets, accommodation, food, vehicle and USD80/Day/Person as salary; Before Tonva`s engineers arrive at the buyer`s factory, the buyer must make sure that all of equipment are put in the correct position in their factory, the raw material, power and water supply must be ready in the factory.C. User TrainingAPOLLO takes responsibility to indoctrinate technical training in both APOLLO and clients' factory to the users, so that they could understand the machine features and could operate the machine by themselves.5. What is the warranty period?a. APOLLO machine Main parts is one year warranty with a lifelong maintenance.b. Mould within one year or 5 millions warranty.1. Can the machine customized only for my products?Yes, most APOLLO machines can be customized as per clients' requirements, including the structure special design and brand of parts special request.2. How about the molds ?APOLLO has its own mold manufacture company for injection and blowing mold. Machine and mold can be tested for samples and smooth matching before shipping. Mold raw material is various for optional.3. What is the business item for this project ?a. Delivery Date: within 45 working days after receive the deposit and samples or drawing confirmed by buyer and APOLLO .b. Port of Loading: SHANGHAI, CHINA.c. Payment: 30% TT deposit, balance before shipment or 100% irrevocable L/C at sight.d. Container needed: One 20GP container.4. How is APOLLO after-sales service?a. InspectionBefore delivery, APOLLO takes responsibility to finish the machine in time and send the righ t samples to clients for approval. Clients also are welcome to APOLLO factory to inspect the testing of machine, so that the provided machine could be safely and smoothly put into operation once reach the client`s factory.b. Debugging InstructionAPOLLO takes responsibility to have debugging overseas, and client abroad please sends in vitation forward of time to engineer of APOLLO , provides the engineer with round-trip tickets, accommodation, food, vehicle and USD80/Day/Person as salary; Before Tonva`s engineers arrive at the buyer`s factory, the buyer must make sure that all of equipment are put in the correct position in their factory, the raw material, power and water supply must be ready in the factory.C. User TrainingAPOLLO takes responsibility to indoctrinate technical training in both APOLLO and clients' factory to the users, so that they could understand the machine features and could operate the machine by themselves.5. What is the warranty period?a. APOLLO machine Main parts is one year warranty with a lifelong maintenance.b. Mould within one year or 5 millions warranty.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...