IPDB › China Industry › Manufacturing & Processing Machinery › Drilling Rig
New Model Xugong Xz430e HDD Horizontal Directional Drilling Machine1
Drilling Rig, Xz430e Machine, Xz430e HDD Machine
Wuhan Yichao Technology Equipment Co., Ltd.
Preview:
Product Description Product DescriptionXZ430E Horizontal Directional Drill Technical SpecificationProduct Model:XZ430E Horizontal Directional Drill(HDD)Manufacturer:XUGONG Foundation Construction Machinery Group Co.; Ltd.XZ430E HDD is the new products which set advanced technology, user experience, efficiency of construction as a whole, and pay more attention to construction requirements, operation habit, system energy saving, and could be widely used in urban pipeline construction such as electric power , communication, cable TV and so on . Product Features1.Hydraulic pilot control, provide comfortable operating performance and flexible regulation, first-class brand of hydraulic components to ensure the reliability of the machine hydraulic system.2.Gear rack thrust/pull design insures operation. Floating carriage can protect the screw thread of the rods.3.High-speed sliding systems, piston motor to achieve high and low sliding speed of carriage, increasing the ability to adapt the machine working conditions, promote construction efficiency.4.The whole machine adopts protection technology such as proportional wire-controlled walking, seat switch, logic interlock, electrical shock protection and , short time Plus 20% force, meet the CE safety certification requirements.5.Sliding, rotating system multiple output, modular common rail fuel system and electronic control module, system energy saving, high efficiency of construction, efficiency increased by 15%.6.Support the diverse needs of customers, the machine can be increased with cab, air conditioner, cold start, mud antifreeze, automatic loading rod, electrical shock protection automatic thread oil daub etc, reduce the working strength, improve the construction efficiency.Product Parameters1.Engine SystemChoose Dongfeng Cummns turbocharged engine, strong power, emissions meet China III emission standard.Engine Type QSC8.3-C240Rated Power 179kWRated Speed 2200 r/minMax Torque 1040 N·m /(1350r/min)Emission Standard ChinaIIIOptional Dongfeng Cummns turbocharged engine, strong power, emissions meet China II emission standard.Engine Type 6CTAA8.3-C240Rated Power 179kWRated Speed 2200 r/minMax Torque 1040 N·m /(1400r/min)Emission Standards ChinaIIOptional SDEC turbocharged engine, strong power, emissions meet China III emission standard.Engine Type SC9DK240G3Rated Power 177kWRated Speed 2200 r/minMax Torque 1040 N·(1200~1600r/min)Emission Standard China III2.Power headThe drilling rig completed by rack and pinion sliding action, floating carriage device can effectively protect the drill thread, variable-speed motor to achieve sliding, the service life of the drill pipe 30% increase; piston motor to achieve high and low sliding speed of carriage, increasing the ability to adapt the machine working conditions, promote construction efficiency.Max. Thrust/Pullback force 430/520 kNMax. Thrusting /pulling speed 48 m/minMax Rotation torque 18500 N·mMax. Rotation speed 170 r/min3. Hydraulic SystemUsing a hydraulic pilot control, hydraulic components are domestic first-class brand. Most important parts of hydraulic system are made of leading domestic and foreign products, good performance, good reliability. Three pumps coordinated action to complete the working, a reasonable allocation of engine power.4. ChassisXZ430E use classic H-beam structure, high quality rubber track, site adaptability, high reliability, breaststroke leg structure, large cylinder support, good stability, Eaton traveling device, stable performance, walking speed can reach 2.6km /h.Track outer distance 2240 mmRubber track width 400 mmTread 2140mmSupporting wheels quantity 2×7pcsGradeability 30%Walking speed 2.6km/hGround pressure 64kPa5. Mud Systerm450L mud pump with a large flow, can meet most of the construction needs, winter construction can be increased with antifreeze systems with mud and mud cleaning system for the whole routine maintenance.Mud maximum flow 450L/minMud maximum pressure 80bar6.Cab(Optional) and ConsoleCan be increased with the cab, air conditioner, reduce labor intensity, improve the efficiency of the operator, collaboration with professional bodies, cab, console ergonomics analysis and research, fully considered during the operation operator comfort and instrument layout is reasonable. 7.Rods Loader(Optional)Semi-automatic pipeloaderXZ430E HDD can option configuration with the semi-automatic pipeloader, used motor rotating structure to achieve handling drill semi-automatization.8.Drilling rods and Drilling Tools(Optional).XZ430E HDD with Drill and Drilling Tools have good performance and stable quality to make sure construction successfully. Other accessories of XZ430E HDD are configured as follows:Name.Type.Form.Specification.RemarksDrilling rodsIntegral/Welded¢83mm×9mm×3m Drilling ToolsBack ReamerExpanding style¢300mm ¢400mm¢500mm¢600mm¢700mm¢800mm¢900mmBack ReamerFluted type¢300mm¢400mm¢500mm¢600mm¢700mm¢800mm¢900mmAccessoriesPilot drilling83Starting Rods83Guiding plate83Torque sleeve83L-nut83Male puller83Female puller83Swivel50tShort connection83Mud systemMud Mixing System2cbm 3cbmInstrumentGuide InstrumentNavigator E/ETXUGONGDetector8100RadiodetectionIII.Main Technical Parameters ItemUniteParameterEngineManufacturers/Dongfeng CummnsSDECModel/6CTAA8.3-C240QSC8.3-C240SC9DK240G3Rated PowerkW/r/min179 /2200179 /2200177 /2200Thrust/PullbackType/Piston Motor+ Reduction BoxMax Thrust/Pullback forcekN430/520Max Thrust/Pullback speedm/min48RotationType/Piston Motor+ Reduction BoxMax Rotation torqueN·m18500Max. Rotation speedr/min170Drilling rodsD × Lmm×mmφ83×3000Mud pumpMax Flow rateL/min450Max PressureMPa8Weightkg12000IV.Main Part ConfigurationNameManufacture factoryEngineDongfeng Cummns/SDECRotation PumpDanfosThrust-Pull PumpDanfosAuxiliary PumpPermcoRotary MotorLiyuanThrust-Pull MotorLiyuan/HuadeReduction BoxXUGONGHydraulic tuboXUGONGHydraulic oil cylinderXUGONGHand Shank XUGONGWalking speed reducerXUGONG/EatonV.Transport ProgramThe machine transportation Dimension 6500×2250×2450mm Shipping weight(standard no cabin,without Drilling rods and Drilling Tools) 12t Shiping weight( Cab,Pipe Loader,without Drilling rods and Drilling Tools) 13.2tVI.Accompanied Attached DocumentsXZ430E HDD machine start when accompanied by the packing list, include the following technical documents:Product CertificateProduct ManualEngine SpecificationEngine WarrantyMud Pump Instruction ManualPacking List (including wearing parts and spare parts inventory, vehicle tools inventory, shipping list with items)VII.Attached EquipmentItemsOptionalXZ430E OptionalEngineEngine ChinaIII SC8.3-C240√/Engine China II 6CTAA8.3-C240/yesEngine China III SC9DK240G3/yesCold start√/Mud system450L Mud pump√/Mud antifreeze/yesMud cleaning/yesPipe LoaderSemi-automatic pipeloader/yesFull-automatic pipeloader//CabSimple machine tent√/Cab and air conditioner/yesWalkingProportional wire-controlled walking,/yesInstantaneous powerShort time Plus 20% force√/Electric shock alarmElectrical shock protection/yesAutomatic application of thread oilAutomatic thread oil daub/yes√-Normal yes-Optional /-No-assembled
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.