IPDB › China Industry › Industrial Equipment & Components › Boiler & Furnace
Waste and Municipal Solid Waste Incineration Steam Boiler (MSW INCINERATOR) /Power Plant/EPC1
Boiler Furnace, Msw, Msw Boiler
Qingdao Braitway Energy Engineering Co., Ltd.
Preview:
Product Description 1. The design of double drum, assembly type, and monolayer arrangement of the boiler room, features the following advantages: compact structure, large heating surfaces, safe and reliabile operation, short construction period, and low installation cost. 2. The furnace shall employ tuff device and cyclone reburning chamber, decreasing the dust contained in the flue gas. The tail shall be equipped with gas handling equipment, which shall make the dust emission concentration to reach to the national primary standard.3. The feeding device with rational structure shall use mechanical bond wind feeding, featuring the following advantages: uniform, reliable, and high mechnization degree.4. The series boiler was appraised as technology development innovation products by Linyi economic and trade commission. Boiler type ItemsLC35-5-1.25LC40-5-1.25LC60-6-1.25LC60-8-1.25LC120-12-1.25Rated output (t/h)556812Rated Working Pressure(Mpa) 1.251.251.251.251.25Rated steam temperature °CSaturatedSaturatedSaturatedSaturatedSaturatedCombustion modeChain layer combustionChain layer combustionChain layer combustionChain layer combustionChain layer combustionFuel typecoal,firewoodwaste of paper material (humidity<20%,sand soil content<5%)waste of paper material (humidity<20%,sand soil content<5%)waste of paper material (humidity<20%,sand soil content<5%)waste of paper material (humidity<20%,sand soil content<5%Grate area (m2)108.38.911.218Heated surface of boiler proper (m2)188.9232.2186254.7372.6Rear part heating surface (m2)99.399.325599.384.97Maximum size of transportation cargo (L×W×H)mm5740×2830×35506320×3230×35308750×3240×35507770×3400×35508200×3350×2930Maximum weight of transportation cargo (t)2328343419Day treatment waste amount (t/d)~35404060120Notes:The design of boiler structure shall be in accordance with the waste composition provided by users.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.