IPDB › China Industry › Industrial Equipment & Components › Heater & Heat Exchanger
Low Noise Customize Heat Treatment Oven Annealing Furnace LPG Furnace for Screw/Binding Wire1
Heater Heat Exchanger, Electric Furnace, Induction Heater
Hangzhou Candid I/E Corp. Ltd.
Preview:
Product Description Product Description 1.1. Model: RJ-90-9 (2 tubes) Power supply: Electricity / Natural Gas / LPG Capacity: 2.0T/8hours Power: 70kw 1.2. Furnace Body 5mm Q235 board furnace shell Lightweight firebrick Internal liner Holocellulose alumina silicate keeping temperature Heating element: Cr20Ni80 1.3. Furnace Tube Thickness: 8mm, Dia.: 800mm, high: 1200mm Material: Stainless Steel 1.4. Working Process of Annealing Wire: a. Two hours heating to 650°C-700°C b. Keeping Temperature 650°C-700°Cfor 2 hours c. Keep the tube in the furnace, cooling for 4 hours till the temperature is about 300°C d. Taking out of the tube put another one in e. When the tube temperature is below 170°C, take the wire out Tube dimension(loading dimension)Φ900×1600mmMax. working temperature850°CHeating temperature680~720°C Material of tube12mm Stainless steel S321 (thickness of cover: 6mm)Electricity consumption per ton170-210KWTemperature keeping precision≤±1°CHeating zone number2Capacity1.5 ton/tube, 3ton/day (2shifts) Detailed Photos FAQ 1. What is your machine type?A: We offer Electricity annealing furnace and gas annealing furnace.2. what is the heating temperature when it work?A: 650-700oC3. What is the capacity for your machine?A: We have different capacity which according to client's request, the most common type is 3 ton/24hours.4. What is the sea port for delivery.A: The nearest sea port from our factory is Shanghai port5. What is the guarantee?A: 12 months after commissioning or 18months after shipment. Whichever first is in valid. (it is excluding wear parts. Shipping cost for parts to be replaced during warranty period has to be borne by the customer.)6. How to install chain link fence machine?A: 1 technicians and 1 interpreter will be assigned to coordinate installation, commissioning and training, for the maximum duration of 15 working days your side will supply the air return tickets, food, accommodation(hotel and one day three meals), transportation, communication, insurance , tax ( if have) for the technicians and the interpreter. USD120.00/day/person working fee will be paid to them.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.