CIPDB › China Industry › Metallurgy, Mineral & Energy › Metallurgy Machinery
High-Speed Steel Making Machine Heavy-Duty Steel Rabar Rolling Mill1
Metallurgy MachinerySteel Re Rolling MillsRolling Mill
Jiangyin Starshine Machinery Technology Co., Ltd.
Preview:
Product Description High-Speed Steel Making Machine Heavy-Duty Steel Rabar Rolling Mill135m finishing mill groupThis top crossing 45 ° high-speed wire rod finishing mill is arranged in the high-speed wire rod production workshop. Through the continuous micro tension rolling of the 10 stands of finishing mills, the rolled pieces of ? 17 ~ ? 21mm conveyed by the upstream mill are rolled into finished wires of ? 5.5 ~ ? 16mm. The guaranteed outlet speed of the unit is 90m / s.Product DescriptionThe finishing mill unit consists of an upper cross 45° high-speed wire rod finishing mill. The finishing unit is located in the high-speed wire rod workshop. ?17 ~ ?21mm rolling material is transported upstream of the continuous micro-tension rolling mill through 10 unit frames, and rolled into ?5.5 ~ ?16mm finished wire rod. Guaranteed working speed of 90 meters/second. The final product specification is ?5.5mm.285/320/340/385 prefinishing mill block4 cantilever mills.Horizontal mill(two stands),vertical loop(three),vertical mill(two stands) and safety hood.Arrangemeng and transmission mode:H-V-H-V;DC motor drives separately.TypesStandsDesign speed(m/s)Guaranteed speed(m/s)Incoming material specification(Фmm)Trimmed size(Фmm)Feed temperature(oC)Motor power(KM)Rolling steel grade135m/s No-twist 45° TOP cross model6 stands (8″*2+6″*4)13550-70Ф13-16Ф6.5-10900-10502000Low and medium carbon structural steels Low alloy steel6 stands (8″*3+6″*3)13550-70Ф13-16Ф6.5-10900-105020008 stands (8″*3+6″*5)13550-80Ф13-19Ф5.5-14900-10501500×28 stands (8″*8)13550-80Ф13-19Ф5.5-16900-10501600×210stands (8″*5+6″*5)13560-90Ф17-24Ф5.5-18900-10501600×3140m/s No-twist 45° TOP cross model10stands (8″*10)14070-100Ф17-24Ф5.5-18900-10501600×310stands (8″*6+6″*4)14070-110Ф17-24Ф5.5-18900-10501600×31600×280m/90m/135m finishing mill and speed increasing boxHeavy duty finishing mill for 45° top cross untwisted high-speed wire rod:?230×10structure,speed increasing box,large base,water baffle and waterproof groove,buffer box,protective cover,coupling,and finishing mill are equipped with pipes.The upstream ?17~?21mm rolled piece is rolled into ?5.5~?16mm finished product.150 sizing/230 reducing/250/260/320 modular millHigh speed rolling,controlled rolling,precision rolling,quick change of complete machine.A double stand reducing mill and a double stand sizing mill are added behind the finishing mill to share part of the extension,which greatly reduces the rolling speed of the finishing mill,reduces the sharp tempurature rise caused by the wire deformatiob in the high-speed area,and contrlis the tempurature of the rolled piece.Auxiliary equipment and spare partsShearing Equipment Includes Flying Shear, Broken Shear, Side Looper (Before Finishing Rolling), Snap Shear, Switch, Etc.Rolling mill spare parts include roll shafts, panels, eccentric sleeves, bearings, roll boxes, cone boxes, etc. Finished Product:If you have higher fineness requirements for the finished product,click our drawing machine,which can help you to get finer steel wire.FAQ:1. Q:What is your minimum order quantity, can you send me samples?A:Our minimum quantity is 1 set, as our product is machinery equipment, it's difficult to send you samples, however,we can send you catalog, warmly welcome you to come visit our company.2. Q:Which level of quality are your products?A:We have got CE, ISO, SGS, TUV certificate so far. 3:What is the delivery time of your machine?A:In general, the delivery time of our machine is about 25~30 days, customized machine will be delivered as the negotiation with our clients.4. Q: How does your factory do regarding quality control? A: CE certificates.One Year Quality Warranty And Life-time Technical Support.5. Q: What payment terms do you accept? A:T/T or L/C or West Union or Money gram or Paypal,others is welcome.6. Q:How you arrange shipment? A: By Sea/By Train/By Air or By Express,20-30days Against Deposit.Packaging&Shipping:
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...