CIPDB › China Industry › Metallurgy, Mineral & Energy › Metallurgy Machinery
Briquette Production Line with The Daily Production of 200 Tons1
Metallurgy MachineryBriquette Production LineThe Daily Production of 200 Tons
Liaoning Jinrong Machinery Import and Export Co, . Ltd
Preview:
Product Description Product DescriptionI.Equipment Technical Requirements and ConfigurationCustomer Raw Materials: 100% eucalyptus chips with a moisture content between 20% and 40%.Production Requirements: 20 tons of machine-made charcoal per day. Required equipment configuration and placement. For a daily production of 200 tons, 10 production lines are required.No.ItemsPower(KW)Capacit(kg)Qty1800 x 6m crusher feeding belt conveyor5.5 1set21300 hammer mill1324000-5000kg1set3325 x 7m screw conveyor4 1set42000 x 20m drum dryer22+15+2.23200-3500kg/h1set52.5 x 1.5 x 2m storage silo1.5x2 1set6219x6m rod feeding screw conveyor3x2 2sets71) Pneumatic conveying with dust removal2)6m spiral feeder3)6m rod collection conveyor4)6m smoke collector4x25.5x23x20.55x2 2sets2sets2sets2sets8Two sets of five briquette making units28*10320-360kg/hour10sets9Five-unit hoisted carbonization furnace4.7x210tonsx22sets10Frequency control cabinet 3setsTotal 510 Notes:1. Please refer to the equipment layout diagram for the space occupied by the above equipment.2. All of the above equipment requires 8-10 workers per shift.3. The above equipment operates at a 50Hz, 380V voltage, requiring a 600kVA transformer for normal operation. (If the voltage is 60Hz or other voltages, an additional electrical modification fee of $4.18 per kW will be charged.)II.Equipment quotation and description NO Name Model QtyUnit Price(USD) Remark 120 tons of machine-made charcoal per dayProduction lines10 lines249,067Chinese standard2Total amount for 10 lines:$ 2,490,669(FOB Qingdao Port)(Installation, molds, spare parts, and consumable parts are not included.)Delivery time is 65 days, and the quote is valid for 20 days. (Please understand that material prices may fluctuate significantly.) 1. The equipment weighs approximately 85 tons. Seven 40-foot high cabinets are required for shipment.2. Our company will provide installation guidance. Three technicians will provide on-site guidance for the customer's workers in assembling and operating the equipment. The customer will work with these three workers at a cost of US$150 per person per day. Visa, travel, food, and lodging expenses are the customer's responsibility.3. Installation of one production line: 20 days; installation of 10 production lines: 90 days.
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...
Message:
OK ! We suggest you detail your product requirements and company information here.
Enter between 20 to 4,000 characters.
Your inquiry content must be between 20 to 4000 characters.