CIPDB › China Industry › Metallurgy, Mineral & Energy › Mining Machinery
Mining Flotation Separation /Mud or Sand Removal and Particle Separation Coal Feeder /Complete Sets of Coal Washing and Preparation Equipment, Source Factory1
Mining MachinerySource FactoryCoal FeederJigging Machine
Hebei Jinrun Mine-Equipment Corporation Group.
Preview:
Product Description Product Description XJM-S Flotation separation:It features high efficiency, energy conservation, high quality, intelligence and specialization. It can be widely applied to the separation of lump coal, unprocessed coal and some raw coal from the coal mine. On-Site InstallationOn-Site Installation of Coal Washing Equipment The on-site installation of coal washing equipment is a critical phase in setting up a coal preparation plant, ensuring efficient operation and optimal performance. The process involves several key steps: 1. Pre-Installation Preparation - Site Assessment:Survey the installation area to ensure proper foundation, space, and accessibility. - Equipment Inspection:Verify that all components (crushers, screens, cyclones, flotation cells, etc.) meet specifications and are undamaged. - Safety Measures: Implement safety protocols, including PPE for workers and hazard controls. 2. Foundation & Structural Setup - Construct reinforced concrete foundations to support heavy machinery (e.g., vibrating screens, centrifuges). - Alanchor bolts and base frames precisely to prevent misalignment. 3. Mechanical Installation - Assembly of Major Components: Install crushers, screens, and separators in sequence according to the plant layout. - Conveyor Systems:Fit belt conveyors with proper tensioning and alignment for seamless coal transport. - Piping & Slurry Systems: Connect pipelines for water, reagents, and slurry flow, ensuring leak-proof joints. 4. Electrical & Automation Integration- Mount motors, control panels, and sensors, wiring them to the central PLC system. - Test emergency stop circuits and automation interfaces for real-time monitoring. 5. Commissioning & Testing- Conduct dry runs to check mechanical movement and vibration. - Perform wet trials with water and raw coal to validate separation efficiency, adjusting parameters as needed. 6. Worker Training & Handover - Train operators on equipment handling, maintenance, and troubleshooting. - Deliver technical manuals and finalize compliance certifications. Key Considerations: - Adherence to engineering drawings and OEM guidelines. - Environmental controls for dust and water recycling. - Post-installation maintenance planning. Efficient installation minimizes downtime and ensures long-term reliability of the coal washing plant. CertificationsCompany ProfileEngineering Design GraphicsCustomers Visit
Purchasing Agent
Note: Send your message to supplier or manufacturer.
Welcome to our Professional and comprehensive procurement services...